BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of an educational facility in Springfield, Missouri. Completed plans call for the renovation of a educational facility.

Provide all labor and materials to replace shingle roofing system for Westport K-8 School, 415 S Golden, Springfield, MO 65802. Question Cutoff Date 3/31/2022 04:25:00 PM (ET) Guttering shall be six inch (6") seamless guttering with gutter guard equal to LeafBlaster Pro. Gutter down spouts shall be replaced comparable to their current termination points into collection box, collection pipe, or to ground level. Fascia board replacement shall include cornice replacement. Cornice and fascia board shall be replaced under coping cap that adjoins the shingle roof sections. Cornice and fascia shall also be replaced on cornice return. Cornice and fascia shall be metal wrapped in Owner selected colors, including cut in reglet on cornice return. See images for more details:

Award

Educational

$74,900.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
1
Bidding Soon
432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2022

July 18, 2022

Project location map

415 S Golden Ave, Springfield, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.