Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Altus, Oklahoma. Completed plans call for the renovation of a 34,000-square-foot military facility.
Contract Award Date: Dec 21, 2021 Contract Award Number: W912BV22C0006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: NSGGGUENWB25 Contractor Awarded Name: SGS, LLC Contractor Awarded Address: Yukon, OK 73099 USA Base and All Options Value (Total Contract Value): $12260151.00 The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for the renovation of Building 213, a Tech Training Dorm, at Altus AFB, Oklahoma. The proposed project will be a competitive, firm-fixed price, design-build contract procured in accordance with FAR 15, Negotiated Procurement using the trade-off process. Project Description: This will be a total turn-key contract to include the planning, design, and construction necessary to renovate Building 213 at Altus AFB, OK. The intent of the project is to upgrade major facility systems of the Technical Training Student Dorm, resulting in a fully functional, up-to-date facility, which will house of 110 enlisted aviators. The renovation consists of the replacement of the standing seam metal roof, which is approximately 34,000 SF in size, the replacement of all domestic and waste piping, and the replacement of hot water heaters. Furthermore, the full Heating, Ventilation, and Air-Conditioning (HVAC) system, will be replaced, and converted from a 2-pipe to a 4-pipe system. In addition to the mechanical systems, the project will require the full replacement of the facility fire alarm system, as well as the addition of a fire suppression system, and mass notification systems throughout. All design and construction shall be considered permanent construction , in accordance with the Department of Defense Unified Facilities Criteria (UFC) 1-200-01.All design and construction shall integrate and adhere to sustainable principles in accordance with UFC 1- 200-02, to include: life-cycle cost-effective practices, as well as the preparation of a life-cycle cost analysis (LCCA) for energy consuming, and renewable energy generating systems. This project will comply with Department of Defense antiterrorism/force protection requirements, per UFC 4-010-01, which will include updates to the HVAC system, and other major facility elements required. It is anticipated the facility upgrade will exceed 50% of the estimated replacement value. In accordance with UFC 3-301-01, the project will follow the guidelines for seismic evaluation, any required compliance measures, and the National Institute of Standards and Technology Grant/Contract Report 11-917-12 - Interagency Committee on Seismic Safety in Construction Recommended Practice 8. In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated magnitude of construction for this project is between $10,000,000 and $25,000,000. The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $39.5M. This project will be solicited as total small business set-aside. MBE (10.8%), WBE (6.9%), SBE (100%) Estimated duration of the construction phase of this project is 540 calendar days.
Award
Military
$12,260,151.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 15, 2021
March 16, 2021
To Be Determined, Altus, OK
Related To This Project
Altus, OK
Bid Date: Jul 20 2022
Altus, OK
Bid Date: Jul 20 2022
Altus, OK
Bid Date: Jul 13 2022
Altus, OK
Bid Date: Sep 05 2022
Altus, OK
Bid Date: Aug 11 2022
Altus, OK
Bid Date: Jul 20 2022
Altus, OK
Bid Date: Jul 20 2022
Altus, OK
Bid Date: Jul 20 2022
Altus, OK
Bid Date: Aug 13 2021
Altus, OK
Bid Date: Jun 01 2022
Altus, OK
Bid Date: May 26 2022
Altus, OK
Bid Date: May 25 2022
Altus, OK
Bid Date: May 11 2022
Altus, OK
Bid Date: Dec 30 2022
Altus, OK
Bid Date: Dec 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.