BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 6, 2021 at 7:00 PM

Updated January 1, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Vicksburg, Mississippi. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The contract time for the work included in this contract is Two Hundred (200) Working Days. The Contract will be subject to liquidated damages in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction. Each bidder must deposit with his proposal a Bid Bond or Certified Check in an amount equal to five percent (5%) of the total bid payable to The City of Vicksburg as bid security. The successful bidder shall furnish a Performance Bond and a Payment Bond each in the amount of 100% of the contract amount awarded. Bidders shall also submit a current financial statement if requested by The City of Vicksburg. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award.

Bid Results

Bridges / Tunnels

$3,445,409.00

Public - City

Demolition, New Construction, Paving, Site Work

66

1

5

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
38
Bidding Soon
352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2020

December 16, 2020

Project location map

Kemp Bottom Rd, Vicksburg, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.