BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2021 at 8:00 PM

Updated October 22, 2024

Renovation of a mixed-use development in Harlan, Kentucky. Completed plans call for the renovation of a 78,990-square-foot educational facility.

The last day for questions will be November 25, 2020.The project consists of the renovation of the existing Harlan Independent Elementary, Middle and High Schools and a 1,400 square foot Cafeteria addition. The renovation includes a new HVAC system, lights and new ceiling work at the Middle School. It also includes new flooring, paint, ceilings, a new HVAC system and lighting at the High School. At the Elementary School, the project includes new windows and floors throughout along with exterior masonry repair, cleaning and tuck pointing. The Cafeteria Addition includes a concrete retaining wall, masonry, new storefront as well as new concrete plaza and canopies. A PEMB Canopy Walkway cover joining the High School and Elementary School along with other entry canopies are also a part of the project. A certified check, payable to Harlan Independent Board of Education, or a satisfactory bid Bond executed by the bidder and acceptable sureties in an amount equal to 5% of the bid amount shall be submitted with each bid. Successful bidders will be required to furnish and pay for satisfactory Performance and Labor and Material Payment Bonds. The bond shall cover the entire base bid cost and any accepted alternates (direct purchase orders must be included). The Owner reserves the right to reject any and all bids and to waive any informalities and/or technicalities to allow for the best interest of the Owner to be served. Bids received after the scheduled closing time for the receipt of bids will not be opened. Any bid not submitted on the proper form shall not be considered. No bid may be withdrawn for a period of sixty days subsequent to the opening of bids without consent of the Harlan Independent Schools Board of Education Direct any questions affecting the preparation of your proposal to Mr. Bo Green, Green Construction, Construction Manager to the above address or phone (606) 248-1110, FAX 606- 248-3527 or via email to bogreen@greenconstructionco.com. Direct technical questions to Kevin Cheek, Sherman-Carter-Barnhart, 2405 Harrodsburg Road, Lexington, KY 40504, Phone (859) 224-1351 or via email to kcheek@scbarchitects.com.

Award

Educational

$900,000.00

Public - City

Renovation

113

36

17

12

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
74
Bidding Soon
970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2020

January 4, 2021

Project location map

420 E Central St, Harlan, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.