Site work for a water / sewer project in Durham, New Hampshire. Completed plans call for site work for a water / sewer project.

This work involves the addition of a new activated carbon odor control system for the sludge processing building 1. Installation of one new activated carbon odor control system for the Sludge Processing Building; 2. Installation of one new activated carbon odor control system for the Sludge Holding Tanks (included as Bid Alternate A); 3. Construction of a new concrete pad for the odor control system adjacent to the Sludge Processing Building; 4. Construction of a new concrete pad for the odor control system adjacent to the Sludge Holding Tanks (included as Bid Alternate A); 5. Upgrade of the heating and ventilation system in the Sludge Garage; 6. Demolition of one gas fired unit heater in the Sludge Garage 7. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. 8. Other appurtenances as shown on the Drawings and specified herein. 9. Maintain plant flow and treatment processes as detailed in Part 3 of this section. 10. Remove and/or relocate equipment as indicated on the Drawings. 11. And all other work as shown on the Drawings and as Specified.1. Installation of one new activated carbon odor control system for the Sludge Processing Building; 2. Installation of one new activated carbon odor control system for the Sludge Holding Tanks (included as Bid Alternate A); 3. Construction of a new concrete pad for the odor control system adjacent to the Sludge Processing Building; 4. Construction of a new concrete pad for the odor control system adjacent to the Sludge Holding Tanks (included as Bid Alternate A); 5. Upgrade of the heating and ventilation system in the Sludge Garage; 6. Demolition of one gas fired unit heater in the Sludge Garage 7. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. 8. Other appurtenances as shown on the Drawings and specified herein. 9. Maintain plant flow and treatment processes as detailed in Part 3 of this section. 10. Remove and/or relocate equipment as indicated on the Drawings. 11. And all other work as shown on the Drawings and as Specified. The Town reserves the right to reject any or all proposals if it is in the public interest to do so or to waive minor informalities. Questions and comments should be directed to Wright Pierce Engineers at 603-430-3728 or at https://www.wright-pierce.com/projects/ January 14, 2022 The method of contractor selection has not been determined at this time. 270 calendar days for substantial completion. 300 calendar days for final completion ;Lquidated damages will be in the amount of $1,500, for each calendar day

Post-Bid

Water / Sewer

$1,346,000.00

Public - City

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
230
Bidding Soon
3,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

April 18, 2022

Project location map

50 Piscataqua Rd, Durham, NH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.