Renovation of an educational facility in Durham, New Hampshire. Completed plans call for the renovation of a educational facility.

The general scope of work for this project includes but is not limited to: Provide Steam Boiler trailer to maintain services to building through demo phase 1, complete demo phase 1 and new work phase 1 as denoted on the plans which includes demo of the steam boilers, and other equipment, new work to include installation of new hydronic boilers and associated equipment. Phase 2 demo and new work to commence once Phase 1 work is complete at which time the building can be switched from the boiler trailer back to the newly installed hydronic system. Work to include entire building controls conversion to Eco structure. Each bid must be accompanied by a bid bond, bank draft or certified check in an amount not less than five percent (5%) of the base bid. Within ten (10) days after the formal opening of bids, bid securities in the form of bank drafts and certified checks will be returned to all except the three (3) lowest bidders. Except for the successful bidder, bid securities in the form of bank drafts and certified checks of the three lowest bidders will be returned within three (3) days after the execution of the contract. The successful bidder's bid security will be returned upon delivery of satisfactory one hundred percent (100%) performance and payment bonds. Award announcement Week of 04/11/2022 Deadline for written questions 03/28/2022 at 12:00 p.m Should the successful bidder fail or refuse to execute and deliver the contract and the performance and payment bonds required within ten (10) days after the date of mailing, faxing, or delivery of the Owner's notice of the bid acceptance, the Bidder shall forfeit to the Owner, as liquidated damages for such failure or refusal, the deposit which the Bidder makes pursuant to the Bid Security section above, or the difference between his bid and the amount of the contract which the Owner actually enters into for the Work, whichever is less. Event Timeline (subject to change) Solicitation Release 03/11/2022 Mandatory Informational meeting 03/21/2022 at 10:00 a.m. Deadline for written questions 03/28/2022 at 12:00 p.m. Response to questions by 04/01/2022 Formal proposals due 04/08/2022 at 12:00 p.m. Award announcement Week of 04/11/2022 Informational Meeting Location: Building & Room # Meet at Southeast Entrance to Gregg Hall Street Address 35 Colovos Road City, NH Zip Durham, NH 03824 The Owner reserves the right to reject any bid when the information supplied does not satisfy the Owner that the Bidder is sufficiently responsible to entrust with the work of this contract. A. The project description in this section is intended to provide an overview of the project scope and specify certain Project Management, Administrative, and Safety requirements. It is intended to supplement other specification sections and the Contract. It is not intended to describe all of the project details or materials and labor necessary to complete the project scope, nor is it intended to describe all of project management or administrative requirements. It also provides an overview of the important anticipated phasing. For a complete scope of work, the Contractor must carefully examine all construction documents including the drawings, specifications, UNH Design & Construction Standards, and supplemental bidding and contract documents provided by the University of New Hampshire (UNH). B. Examination of Existing Conditions: The central steam & hot water plant located in Gregg Hall must remain operational during the construction either via the existing steam system, rental steam boiler, or phased switchover to hot water. Building interruptions including phased utility switchovers must be planned in advance with the Owner. The construction documents are intended to show intent and do not depict all existing components and systems. Therefore, in order to work safely and avoid unintentional interruption of services and/or demolition of components and equipment which is to remain in service, Contractor is responsible for discovering existing conditions prior to beginning construction. C. The Prime Contractor referenced herein shall be the Mechanical Contractor. Construction Schedule: Construction Begins 05/02/2022 Construction Complete 08/31/2022

Post-Bid

Educational

$50,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
92
Bidding Soon
2,055
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

May 2, 2022

img_map_placeholder

35 Colovos Rd, Durham, NH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.