BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2020 at 7:00 PM

Updated October 19, 2024

Site work for a water / sewer project in Wolfe City, Texas. Completed plans call for site work for a water / sewer project.

Bids are invited for several items and quantities of work as follows: 1. Construction of a new water well at the existing, inoperable, water treatment plant including piping, site piping, electrical improvements, and associated appurtenances. 2. Improvements to an existing chlorination system including all necessary system hardware, piping, site piping, electrical improvements, and associated appurtenances. Please submit questions for this project at least 5 business days prior to bid opening through online or to Matthew Armstrong, P.E. at marmstrong@ksaeng.com. A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the City of Wolfe City or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. The City of Wolfe City reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the City of Wolfe City for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all of Contractor's obligations under the Contract. The City of Wolfe City reserves the right to reject any or all bids, evaluate bids using scoring criteria, or to waive any informality in the bidding in accordance with Title 8, Subtitle A, Chapter 252.043 of the Local Government Code. The Work will be substantially completed within 180 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 210 days after the date when the Contract Times commence to run.

Bid Results

Water / Sewer

$1,714,653.00

Public - City

Site Work

18

1

4

8

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
225
Bidding Soon
3,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2020

January 11, 2021

Project location map

To Be Determined, Wolfe City, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.