Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, new construction and renovation of a mixed-use development in Barneveld, Wisconsin. Completed plans call for the renovation of a water / sewer project; for the construction of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Awarded. The work for which bids are asked includes, but are not limited to, the following: the construction of a Screening Building, which will house a vertical fine screen in an 8-ft diameter precast concrete manhole; construction of a cast-in-place concrete flow monitoring structure, which will house a Parshall flume; permanent emergency generator; well pumping upgrades; plumbing work; HVAC work; electrical work; grating, walkways, handrails, and miscellaneous metals; new and modified yard piping and manholes; site work including dewatering, grading, and access driveway; turf restoration and erosion control. The anticipated substantial completion date is September 25, 2021 and final completion date is October 29, 2021. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdraw within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. This project anticipates use of Wisconsin DNR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. OWNER reserves the right to waive any informalities or to reject any or all bids.
Award
Water / Sewer
$1,077,415.00
Public - City
New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2020
December 18, 2020
To Be Determined, Barneveld, WI
Related To This Project
Barneveld, WI
Bid Date: May 04 2022
Barneveld, WI
Bid Date: Dec 01 2023
Barneveld, WI
Bid Date: Nov 30 2023
Barneveld, WI
Bid Date: Dec 01 2023
Barneveld, WI
Bid Date: Feb 08 2024
Barneveld, WI
Bid Date: Mar 14 2024
Barneveld, WI
Bid Date: Mar 15 2024
Barneveld, WI
Bid Date: May 01 2024
Barneveld, WI
Bid Date: Apr 07 2023
Barneveld, WI
Bid Date: Mar 03 2022
Barneveld, WI
Bid Date: Nov 08 2022
Waupun, WI
Bid Date: Mar 03 2021
Cedarburg, WI
Bid Date: Dec 21 2020
Madison, WI
Bid Date: Dec 23 2020
Waukesha, WI
Bid Date: Feb 12 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.