BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2021 at 8:00 PM

Updated November 20, 2025

Renovation of a municipal facility in Las Vegas, Nevada. Completed plans call for the renovation of a municipal facility.

For Code Enforcement Administration and Animal Control: Relocation Sunset Park to Russell Campus A requirement of the contract includes a certification that Bidder is not currently engaged in and agrees for the duration of the contract not to engage in, a boycott of Israel. The package and/or WebEx information is available Online or by calling (702) 455-6277. Hearing impaired customers please call TT/TDD: Relay Nevada toll-free (800) 326-6868. APN# 162-31-101-004 RP# A0320006 ESTIMATED COST: $332,500.00 - $350,000.00. The "Project" of which the "Work" of the Contract is a part titled, "Code Enforcement Administration & Animal Control Dispatch Relocation Sunset Park to Russell Campus" and is located at 4701 West Russell Road, Las Vegas, Nevada (APN 162-31-101-004). The "Work" is described in the Project Drawings and Divisions 1 through 26 of the Project Manual. The Work consists of the construction and renovation of approximately 5,400 square feet of interior office space within a single-story government building housing the Clark County Building & Fire Prevention Code Enforcement & Animal Control. Construction includes all administrative work as required by division one general requirements; selective interior demolition as required and specified; installation of cold-formed metal in-wall support; installation of specified gypsum board on existing interior walls with specified interior painting; installation of new acoustical ceiling tiles as required and specified; installation of acoustical wall panels as required and specified; installation of window treatments and rolling chair mats; installation of new antennae, support, and cabling at roof; installation of new HVAC piping, equipment, ducts, air terminals and diffusers as required and specified; installation of new low voltage electrical power conductors and cables as specified; installation of hangers and supports for electrical systems as specified; installation of raceway, boxes and wiring devices for electrical systems as specified; installation of interior lighting and lighting controls as required and specified. Construction includes the construction of interior offices with integrated doors and modular system furniture, including relocation of related HVAC, lighting, power, data and fire protection using materials noted on Drawings and specified herein Question Cutoff Date: 1/14/2021 01:00 PM (ET)

Award

Municipal

$296,748.00

Public - County

Renovation

26

26

16

7

Subscribe For Documents

149 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
1
Bidding Soon
425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2021

March 1, 2021

Project location map

4701 W Russell Rd, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.