BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2021 at 8:00 PM

Updated October 29, 2024

Site work, new construction and renovation of a civil project in Hugo, Oklahoma. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The project is for the City of Hugo and consists of rehabilitating of their water treatment plant, new floating intake structure, new PVC raw water main, new elevated water storage tank, and new ground storage tank. Estimate $8,147,600 Water Treatment Plant, Intake Structure & Elevated Water Storage Imps Hugo Municipal Authority The existing water system in Hugo, Oklahoma will undergo improvements. We understand a new 2.0MG water storage tank and a chemical / lab / office building will be added to the existing water treatment plant located east of town along US-70. At the site of the existing water standpipe near the intersection of Lee Street and Stewart Street a composite 0.5MG elevated water storage tank approximately 70-feet tall will be erected. This report describes the subsurface conditions encountered in the borings and provides geotechnical recommendations for earthwork and the design and construction of foundations, floor slabs and below grade walls. QA Expiration Date has changed from 12/15/2020 5:00:00 PM CST to 12/16/2020 5:00:00

Under Construction

Water / Sewer

$10,326,435.00

Public - City

New Construction, Renovation, Site Work

97

1

45

12

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
69
Bidding Soon
1,027
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2020

February 16, 2021

Project location map

To Be Determined, Hugo, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.