BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Fresno, California. Completed plans call for the renovation of a power facility; and water / sewer project.

The scope of work includes the construction of the Substation Expansion at the Regional Wastewater Reclamation Facility. This project will expand the existing substation to add another 70KV to 12KV transformer (pre-purchased and assigned to this contract), rated at 10 Mega Volt Amp (MVA). This expansion will include the addition of a high-side circuit switcher and connection to the existing switchgear installed in 2009. All proposals must be made on the BidProposalFormprovided by thePurchasing Manager. A Bid Deposit, which can be provided separately, in the amount of TENPERCENT (10%) of the TotalNetBidAmount(or, in bidswithAddAlternates, the highest possible combinationof theBaseBid plusAddAlternates) in the formof a certified or cashier's check, an irrevocable letter of credit, or a certificate of deposit or a bidder's bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. . All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier's check, which must be brought to thePurchasing Manager's office and labeled accordinglywith bid number prior to the bid opening. 100 percentPaymentBond and 100 percentPerformanceBond forallpublic works contracts must be filed with the Contract Documents and approvedby the City beforethe Contractor enters uponperformance of the Work. Bidders are advised that as required by the Fresno MunicipalCode, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%. Estimated Bid Value $2,470,000 The City reserves the right to reject any and all bids.

Post-Bid

Water / Sewer

$2,470,000.00

Public - City

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
17
Bidding Soon
415
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2022

June 10, 2022

img_map_placeholder

To Be Determined, Fresno, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.