BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Kearney, Nebraska. Completed plans call for the renovation of a military facility.

The General, Mechanical, Electrical and all other work, will be under one (1) Bid. All subcontractor quotations shall be sent to the General Contractor. D. BID SECURITY 1. Each proposal must be accompanied by a bid bond or a certified or cashiers' check in the sum of five percent (5%) of the proposal, as a guarantee of good faith, drawn on a solvent bank and made payable to the order of the Nebraska Department of Veterans' Affairs, which will be retained by and may be forfeited to the Department, as liquidated damage if such proposal is accepted, the Contract awarded, and the bidder or bidders fail to enter into a contract in the form prescribed, with a satisfactory surety bond, within ten (10) days after such award is made. 2. The bid deposit of all except the three (3) lowest bidders may be returned within three (3) days after the opening of bids. The bid deposit of the three (3) lowest bidders may be returned within forty-eight (48) hours after the executed contract and required bonds have been finally approved by the Department. E. Performance Bond: The Contractor shall be required to furnish acceptable bonds to complete the work and pay for all labor and materials used, said bonds to be in the amount of 100% of total amount of the Contract. F. EXEMPTION FROM PAYMENT OF NEBRASKA SALES/USE TAX 1. The Contractor is exempt from payment of the Nebraska Sales/Use Tax under the regulations of the Nebraska Department of Revenue Act of 1967. The Nebraska Department of Veterans' Affairs will issue an Appointment of Purchasing Agent form and Exemption Certificates to the Contractor to be used for this project. 1) Email Contact: Wes Seals 2) Email Address: wseals@wilkinsadp.com. Online Bid Opening - When logged into Zoom meeting, please list full name for proper access and attendance. Repair all damage done to the premises as a result of this installation and the removal of all debris left by those engaged in this installation. All work involved in making stands and supports for all equipment as required and cutting of equipment holes for pipes, drains, etc., required for the installation. All food service equipment and fixtures shall be clean and ready for use at the time the Project is turned over to the Owner. The FSEC shall repair, refinish or replace any equipment damaged in transit or during installation, to the satisfaction of Owner. April 12, 2021: Substantial Completion. May 3, 2021: Final Completion. Location- 4510 EAST 56TH STREET, KEARNEY, NE 68845

Award

Military

$222,400.00

Public - Federal

Renovation

6

18

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
14
Bidding Soon
126
All Active Projects
56
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2020

December 21, 2020

img_map_placeholder

4510 E 56th St, Kearney, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.