BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miramar, Florida. Completed plans call for site work for a water / sewer project.

The work shall include, but is not limited to all labor, materials, machinery, tools, equipment and incidentals, as necessary for the installation of 6-inch watermain. *This project timeline has been extended due to the public health crisis. Deadline for written questions :- November 23, 2020 at 6:00 PM. The Scope of Work includes Phases 1A as the Primary Project, but is not limited to all labor, materials, machinery, tools, equipment and incidentals, as necessary for the installation of 6-inch watermain to be installed through a combination of an open cut installation and horizontal directional drills. Pipe material to be a combination of ductile iron pipe (DIP) and` high-density polyethylene (HDPE). Pipe installation to include gate valves, fire hydrants, applicable fittings, water services, meter boxes and connections to the existing mains. Work is also to include applicable demolition and restoration required during pipe installation Alternate Phase 1B has a substantial completion of 210 days and final completion of 240 days. Alternate Phase 1C has a substantial completion of 150 days and final completion of 180 days

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

122

1

4

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
47
Bidding Soon
1,110
All Active Projects
503
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2020

January 14, 2021

img_map_placeholder

3851 SW 132nd Ave, Miramar, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.