BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 21, 2020 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a pre-engineered storage facility in Boardman, Oregon. Completed plans call for the construction of a 16,000-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Port of Morrow will be acting as the General Contractor for this project. Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279a.120. The bidder is subject to all requirements regarding the payment of Prevailing Wage Rates per Public Works Project ORS 279c.800 to 279C.850.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$356,286.00

Public - Federal

New Construction, Site Work

4

3

8

12

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
20
Bidding Soon
321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2020

January 4, 2021

Project location map

73336 Lewis & Clark Dr., Boardman, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.