Site work, paving, new construction and renovation of an educational facility in Greensburg, Pennsylvania. Working plans call for the renovation of a educational facility; and for the construction of a educational facility.
As of August 2024, a new architect has been attached to this project. This project is unlikely to begin prior to the second quarter of 2025. Project Number 003032 The project is comprised of the following Prime Bid Contracts: Prime Contract 1 - General Construction (Areas D, E, G, H, J) Prime Contract 2 - Casework (Areas D, E, G, H) Prime Contract 3 - Swimming Pool & Associated Equipment (Area H) Prime Contract 4 - Fire Protection (Areas D, E, G, H) Prime Contract 5 - Plumbing Construction (Areas G & H) Prime Contract 6 - Electrical Construction (Areas G, H, Site Lighting, Site Service (see Matrix) The project consists in building a new Main Gymnasium and Natatorium addition in the north side of the building (areas G &H), central plant upgrades and renovations at locations in areas D & E. A second bid event will occur in the fall to complete renovations in the rest of the building. General Construction includes but is not limited to: All sitework including modifications to the existing parking lots and a new parking lot, temporary fencing and site controls, site utilities and landscaping. Temporary partitions, doors, and ramp, select building demolition, concrete masonry and steel work, waterproofing and air barriers and metal wall panels. Roofing and windows for the new additions are included in this contract. The roofing and exterior windows for the existing building will be part of a separate GESA contract. All doors, frames and hardware, Aluminum entrances, sunshades, curtain wall, borrowed lites and glazing, partitions, ceilings, wall and floor finishes, painting, all division 10 items, food service equipment in the concession area, tech ed and art equipment, athletic equipment, stage rigging and curtains, window treatments and elevators are included. Casework will include but not limited to all plastic laminate casework, millwork, science casework and equipment, tech ed casework, countertops, and braces. Swimming Pool Construction will include work as shown in the documents. Strong coordination with the GC, plumbing, mechanical and electrical contractor is required. Fire Protection renovations include a new back flow preventor and main serving the new additions. New fire protection shall be provided for the new additions G&H as well as piping and coverage to areas D&E of the renovated areas. Mains shall be capped for future connection for phase 2 of the project. Plumbing for the Additions areas G&H include providing bathroom fixtures (water closets, urinals, and lavatories) with low-flow fixtures; ADA upgrades, providing mixing valves, floor and roof drains, water hammer arrestors, domestic water heaters, domestic water pumps, sump pumps and duplex ejector pumps. Electrical Installation of new 2000A 277/480V Main Distribution Switchboard Sports Plex (MDSP). The existing site utility transformer will be removed and relocated. The feed to the existing Field House will be intercepted and extended to the new utility site transformer. New distribution panel feeders will be installed from MDSP. 480V-208/120V transformers will be installed between 480/277V distribution and panelboards to 208/120V panelboards. Power connection for HVAC and plumbing equipment. Including chiller, rooftop equipment, fan coil units, cabinet heaters, pumps, etc. connects will be provided with new conduit and cabling. Provide grounding system with proper building ground and service grounding. Tamper proof duplex and tamper proof ground fault circuit interrupter devices. Install devices for special equipment. Provide LED light fixtures throughout Areas G and H within scheduled bid event 1. Daylight harvesting and occupancy sensors will be installed. All areas will get new lighting controls and switching. Site lighting will have selected new site light bases, poles, and fixtures. There will be selected concrete bases to remain with new poles and fixtures. Public electrical contractor will only provide back boxes and conduit for fire alarm. GESA subcontractor will be installing all fire alarm cabling, sleeves, J hooks, fire caulking, devices, and testing. Provide boxes, tile/masonry rings, conduit fittings, conduit, conduit supports, and plastic bushing on conduit for fire alarm in areas of accessible ceilings. Provide box, conduit fittings, conduit supports, conduit, and plastic bushing on conduit to nearest accessible ceiling with coordination with GESA fire alarm provider in areas of exposed ceilings. Provide a new PA intercom speakers and clock. Headend equipment will be provided and installed by the GESA subcontractor. There will be new corridor clocks with new classroom clocks. Gymnasium and Natatorium will receive sound system. AV system will be provided with owner supplied interactive displays. Provide Communications equipment racks and patch panels. Horizontal cabling with supports. Provide fiber backbone cabling. Installation of jacks and plate covers. SiteloqIQ would like to invite you to participate in the bidding process for this construction project by utilizing our Construction Project Management Software, "Procore." Procore helps to streamline the bidding process by allowing bid invitees to download relevant bid documents and submit their bids electronically. In this system, all electronic correspondence is tracked and archived, and bidders are provided with the most up to date information available for the project. We feel that this tool will simplify the bidding process for your project team by cutting down on the amount of filing and paperwork that typically accompanies bid management. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Submit all questions and requests for information in writing via email regarding the Drawings and Project Manual to the Architect and Construction Manager: Core Architects: Pete Szymanski at pszymanski@corepgh.com David Nitchkey at dnitchkey@corepgh.com SitelogIQ: Tim Werner at tim.werner@sitelogiq.com Jen Sariano at jennifer.sariano@sitelogiq.com Dewanna Laning at dewanna.laning@sitelogiq.com Questions will be accepted until end of day, Friday, July 14, 2023. All addenda, except addenda extending the bid deadline, will be issued no later than Monday, July 17, 2023. PLEASE NOTE: Alterations and Additions to Hempfield Area High School - Bid Event 1 is a HYBRID Project. There is a separate GESA Bidding Event running concurrently with the PRIME Bidding Event.
Final Planning
Educational
$128,000,000.00
Public - City
New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2023
May 1, 2025
4345 PA-136, Greensburg, PA
Related To This Project
Greensburg, PA
--
Greensburg, PA
Bid Date: Nov 09 2022
Greensburg, PA
Bid Date: Dec 13 2022
Greensburg, PA
Bid Date: Nov 17 2022
Greensburg, PA
Bid Date: Nov 18 2022
Greensburg, PA
--
Greensburg, PA
--
Greensburg, PA
--
Greensburg, PA
Bid Date: Feb 28 2023
York Springs, PA
Bid Date: Sep 21 2022
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Oct 11 2022
Philadelphia, PA
--
State College, PA
Bid Date: Oct 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.