Published May 24, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Chino, California. Completed plans call for site work for a water / sewer project.

The Work consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start up and deliver a complete and fully functional project in accordance with Bid Documents. The project includes, but is not limited to, demolishing the existing 24-inch recycled water pipeline, installing new 24-inch recycled water pipeline, and earth work as necessary, shown on the Drawings. The project will also provide approved means of equipment protection from damage due to vandalism, weather exposure orconstruction activity, until the pipe and other associated equipment is ready for the installation; complete all required testing in accordance with the requirements of the Contract Documents; and complete start-up and commissioning of the completed installation. The site of the Work is located adjacent to the east bound lane of Orchard Street between Ramona Avenue and Pradera Avenue and immediately east of the San Antonio Flood Control Channel in the City of Montclair. Q & A Deadline:Dec 3, 2020 5:00 PM Physical construction shall start on or after April 16, 2021, The Work shall be completed within sixty (60) calendar days

Award

Water / Sewer

$128,297.00

Public - City

Site Work

10

1

192

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
130
Bidding Soon
2,406
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2020

April 16, 2021

img_map_placeholder

Multiple Locations, Chino, CA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Orchard Recycled Water Turnout Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.