BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Lincolnshire, Illinois. Design plans call for site work for a water / sewer project.

As part of the Village-Wide Drainage Study, Christopher Burke Engineering designed a relief storm sewer for the northern portion of Lincolnshire Drive to improve drainage. The designs will provide enough drainage relief to accommodate for a 10-year storm event. Designs are to install a new 36" sewer along Oxford Drive from Lancaster Lane to Melrose lane, a 42" sewer from Melrose to Lincolnshire Drive, a 48" main through the Spring Lake Park Parking Lot, and a 66" sewer through the parking lot into the Des Plaines River. The plan is to install the new storm sewers directly adjacent to the existing 42" and 48" sewers along Oxford Drive. The plans also include a new 36" lateral storm line along Lancaster Lane to Yorkshire Drive and 24" storm main on Lincolnshire Drive south to existing infrastructure near 90 Lincolnshire Drive. The improvements will provide a 10-year level of flood protection. Phase II design engineering was approved by the Village Board in 2020 and is currently ongoing. Staff applied for a $2.5 million grant from the Lake County Storm Water Commission to be used towards the construction of this project but has not yet received a response on on potential grant award to date. Funds requested for 2024 are to continue with engineering of the planned project. As of February 22, 2024, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024-2025. A firm timeline has not been established; however, construction is scheduled for FY2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$6,450,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
124
Bidding Soon
2,070
All Active Projects
905
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

img_map_placeholder

Lincolnshire Dr, Lincolnshire, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.