BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Denton, Texas. Completed plans call for site work for a water / sewer project.

**Estimated budget: Project Total: $2,274,090 Construction Contingency: $227,409 Project Total with Contingency: $2,501,499 This project consists of rehabilitating the Dam and dredging the pond. Dam will widened, new spillway constructed and bridge over spillway installed. Pond will be drained and dredged according to plans and specifications. Spoils will be hauled by contractor but stored on a City parcel of land. Disposal cost will not be required as spoil will be stored on City property. In accordance with the City of Denton's Policies and Procedures, the City of Denton (the City) is requesting submissions to contract with an individual or business with considerable experience in providing goods or services of this solicitation. The responses and the cost solutions shall be submitted to the City of Denton in a sealed submission. The awarded individual or business shall possess a proven track record of using innovative approaches to providing goods and services that represent the best value to their clients. The awarded individual or business shall have the ability to accomplish all aspects of the requested services. The selected individual or firm should be able to provide innovative methods to deal with municipal challenges, and cost effective solutions. A firm may submit a solicitation response for one or more of the categories of product or services requested in this solicitation. The submittal process may take significant time. The City highly recommends that respondents do not wait until minutes before the due date and time to submit proposal. 46945 Submissions via email will not be accepted. Hard copy bid bonds are required. Question Cutoff Date 12/18/2020 01:00 PM (CT) Questions must be submitted by the deadline via IONWAVE only (no emails/no phone calls)

Award

Water / Sewer

$2,747,006.00

Public - City

Site Work

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
66
Bidding Soon
3,501
All Active Projects
1,395
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2021

March 5, 2021

img_map_placeholder

To Be Determined, Denton, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.