Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 21, 2021 at 7:00 PM
Updated November 15, 2023
Site work and paving for a bridge / tunnel in Millbank, Ontario. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Rehabilitation of two (2) bridges in Wellesley Township as well as two (2) railing assessments with recommendations. Bridge locations are Hergott Road at Conestogo River and Hergott Road at Boomer Creek. TIMELINE: Request for Proposal for consulting engineering services has closed. Whether or not an award has been made is unreleased. Preliminary budget estimates are less than $1 million. Project may be followed once approved to bid. Coverage of this report is discontinued at this time.
Award
Bridges / Tunnels
$500,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2024
Multiple Locations, Millbank, ON
Related To This Project
Millbank, ON
Bid Date: Sep 17 2024
Millbank, ON
Bid Date: Mar 25 2025
Millbank, ON
Bid Date: Mar 25 2025
Millbank, ON
Bid Date: Mar 27 2026
Millbank, ON
--
Haldimand, ON
Bid Date: Aug 17 2021
Oakville, ON
Bid Date: Sep 01 2020
Ottawa, ON
Bid Date: Dec 21 2021
Toronto, ON
Bid Date: Dec 21 2021
Palmerston, ON
Bid Date: Dec 21 2021
Barrie, ON
Bid Date: Dec 21 2021
Belleville, ON
Bid Date: Dec 21 2021
Toronto, ON
Bid Date: Dec 21 2021
Cambridge, ON
Bid Date: Dec 21 2021
St Jacobs, ON
Bid Date: Dec 21 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
