BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2020 at 7:00 PM

Updated September 14, 2023

Site work and paving for a transportation facility in Hugoton, Kansas. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

For Crack Repair, Slurry Seal, and New Markings for Runway 13/31 This project consists of marking removal, crack repair, slurry seal, and installing new runway markings. This project will be constructed in 3 phases to minimize runway closures and allow Runway 2/20 to be open as long as possible during the project. The duration of this project is 30 total working days with a 30 day hold before placing permanent markings. Each bid must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid. The bid guaranty may be by certified check or bid bond made payable to Hugoton, Kansas.

Post-Bid

Transportation Terminals

$600,000.00

Public - County

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
81
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2020

January 8, 2021

Project location map

To Be Determined, Hugoton, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.