Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Las Vegas, Nevada. Completed plans call for the renovation of a detention facility.
Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The "Work" consists of the removal and replacement of approximately 10,000 square feet of the existing quartz polymer flooring and base within the basement kitchen of the Clark County Detention Center and inside approximately seven adjacent cooler/freezers and replace the existing flooring with a new heavy-duty polyaspartic urethane coating flooring system. Construction also includes the removal and disposal of two existing industrial tray washers and installation of two new industrial tray washers. The Construction includes all Administrative Work and Coordination as contained within Division 01 General Requirements of the project specifications. Construction consists of Selective Demolition of the existing quartz polymer flooring system using vacuum and filter equipped machinery in order to protect indoor air quality. Cast In Place Concrete to include Work within one of the cooler/freezers over the existing insulation, which will include the installation of a concrete ramp, Railing and Guardrail Work to include schedule 40 galvanized tube steel cart railing installed to protect walls and equipment from damage and the removal and replacement of kitchen floor drains. Question Cutoff Date 12/23/2020 01:00 PM (ET) In addition to the above, the stainless-steel wall covering throughout the kitchen area will be trimmed at 18" above grade and the new flooring system to die into a finish trim behind the stainless-steel wall. The application of Joint Sealants and Security Epoxy Grout throughout and where applicable. Resinous Flooring Work to include the replacement of the existing quartz polymer flooring and base with a heavy-duty polyaspartic urethane coating flooring system, to include the removal, preparation and installation of approximately 3,820 square feet of new epoxy flooring within the hallway outside of the 6-pack elevator vestibule to the laundry area and from the 6-pack elevator to the end of the corridor past the Chiller room as shown on sheet A1.0 and specification 09 67 23-4. Work shall also include the removal of approximately six square feet of flooring within the existing Laundry room and replacement of heavy-duty polyaspartic urethane coating flooring system also shown on sheet A1.0 and within 09 67 23-4. HVAC Work to include the repair of all non-functioning components of the cooler/freezers including the heating coils and the replacement of the thresholds. Electrical and Pl umbing Work to include the dismantling and relocation, as well as the professional reinstallation of all existing kitchen equipment, including the procurement and utilization of a professional kitchen contractor to assist with the reconnection of all kitchen equipment. Construction also includes the removal and proper disposal of two existing industrial tray washers and the preparation and professional installation of two new industrial tray washers, to include any electrical, plumbing and venting connections as indicated on the MEP drawings, work to include ceiling repairs if necessary.
Award
Jails / Prisons
$1,100,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2021
March 8, 2021
330 S Casino Center Blvd, Las Vegas, NV
Related To This Project
Las Vegas, NV
Bid Date: Apr 03 2020
Las Vegas, NV
Bid Date: Apr 03 2020
Las Vegas, NV
Bid Date: Dec 03 2020
Las Vegas, NV
Bid Date: Dec 08 2020
Las Vegas, NV
Bid Date: Jun 08 2020
Las Vegas, NV
Bid Date: Jan 20 2021
Las Vegas, NV
Bid Date: Jul 01 2020
Las Vegas, NV
Bid Date: Sep 26 2023
Las Vegas, NV
Bid Date: Dec 16 2021
Las Vegas, NV
Bid Date: Sep 08 2021
Las Vegas, NV
Bid Date: Nov 16 2021
Las Vegas, NV
Bid Date: Oct 07 2021
Las Vegas, NV
Bid Date: Sep 02 2021
Las Vegas, NV
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.