BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a mixed-use development in Fountain Valley, California. Completed plans call for the construction of a 110,000-square-foot, three-story above grade municipal facility; for site work for a bridge / tunnel; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of June 02, 2021, project has been awarded in the amount of $102,544,973.30. Construction of a three-level office building, approximately 110,000 SF. A public lobby, board room, conference rooms, break rooms, catering kitchen and storage rooms, restrooms and employee offices, surface parking, landscaping, site drainage, sidewalks, and curb and gutters. A pedestrian bridge spanning from the new building to inside the perimeter of Plant 1 will be part of the development. PROJECT DESCRIPTION: The Project is located North of Ellis Avenue between Pacific Street and Bandilier Circle in Fountain Valley, CA. The Work involves the construction of a three-level office building, approximately 110,000 SF in size. The building superstructure consists of mass timber and steel-braced structures. The building will include public lobby, board room, conference rooms, break rooms, catering kitchen and storage rooms, restrooms, and employee offices. Two interior elevators are within the building. The building perimeter will include 8-foot high ornamental steel fencing along the north section; a steel fence will enclose the courtyard area. The site will be developed with surface parking, landscaping, site drainage, sidewalks, and curb and gutters. A transformer and trash enclosure will be located on the parking site. The building will be supported on deep foundations using cast-in-drilled hole caissons encased in a 3-ft thick concrete pilecap. A pedestrian bridge spanning from the new building to inside the perimeter of Plant 1 will be part of the development. Demolition includes one trailer and one precast concrete tilt-up single-story building on 5" thick concrete slab on grade foundation and its asphalt parking areas. Several utilities will be constructed from the plant site to the building across Ellis Avenue. Utilities will also be required to be coordinated and connected to City-owned utility mains as well as other utility agencies. Hazardous material at the existing concrete tilt-up building will be abated.

Award

Municipal

$102,544,973.00

Public - County

LEED Certification, New Construction, Paving, Site Work

715

77

641

9

Subscribe For Documents

135 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
114
Bidding Soon
2,434
All Active Projects
1,086
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

May 31, 2021

img_map_placeholder

10844 Ellis Ave, Fountain Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.