BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Morrisville, New York. Completed plans call for the renovation of a educational facility; and 63,274-square-foot, three-story above grade laboratory facility.

The State University Construction Fund is seeking statements of qualifications from firms to provide Construction Management Services for the following project: Crawford Hall was constructed in 1976 and is a 3-story steel frame masonry clad building at 63,274 gsf. Crawford Hall is the campus primary laboratory/science building with the biology and chemistry laboratories located in the east wing of the building. The building is L-shaped with the lecture hall, classrooms and faculty offices located in the east/west wing and the science laboratories and related faculty office located at the east end of the building, running north and south. The two wings are separated by a vestibule circulation space on all three floors. For nomenclature the east end, north/south wing will be referred to as the Science Wing and the east/west wing will be referred to as the Classroom Wing. Renovations of the common space/vestibule area on all three floors is included in this project. The roof and most of the roof top fume hood exhaust fans were replaced in 2019. The elevator is planned to be replaced with a targeted elevator replacement project. The building restrooms located in the Classroom Wing were renovated in 2020. The building offices, laboratories and classrooms are largely untouched by renovation and are in poor condition. The laboratories are the only general lab spaces for teaching science courses on the campus. The rooms are in poor condition from past roof and heating distribution system leaks, many of the fume hoods and lab sinks no longer function properly and the gas supply to some of the lab benches has been shut off due to poor conditions and leaks. The overall finishes in the labs are in fair to poor condition. Complete renovation of the three-floor lab wing of the building. Work includes, abatement, demolition, new walls, finishes, lab benches, hoods, HVAC, FP, Electrical.

Post-Bid

Laboratories

$16,480,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
66
Bidding Soon
755
All Active Projects
408
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2022

October 10, 2022

img_map_placeholder

80 Eaton St, Morrisville, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.