BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Fremont, Ohio. Completed plans call for the renovation of a municipal facility.

The work will consist of single prime contract for the removal of the existing slate roof and replacement with new standing seam copper roofing. The estimate of probable cost for this project is $559,900 Bidders shall not be responsible for paying sales taxes on materials incorporated into the structure All Requests for Information (RFI) and questions must be e-mailed to collertj@poggemeyer.com. No telephone calls. A copy of our RFI form is included in the specification manual and can also be found at website. The bid guaranty may be of two forms: 1. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) 2. A copy of a certified check, cashier's check or letter of credit in favor of the Sandusky County Commissioners, in the amount of ten percent (10%) of the bid, shall be submitted with the electronic bid.The original must be received by Sandusky County within three days of receipt of the bid.If the contract is awarded a Contract Bond will be required, which is a one hundred percent (100%)payment and performance bond. Bidders shall submit with their bid the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Sandusky County, Ohio The successful bidder will be required to pay not less than the minimum wage rates established by the Department of Commerce, Division of Industrial Compliance, Bureau of Wage and Hour Administrationof the State of Ohio in accordance with all provisions of the Prevailing Wage Act of the State of Ohio, ORC Sections 4115.03 and 4115.16 and related requirements. The Owner reserves the right to reject any and all bids and to waive any irregularity in any bid and to determine the lowest and best bidder. In no case will an award be made until all necessary investigations are made as to the qualifications of the bidder to whom it is proposed to award the contract. No bidder may withdraw his bid for a period of sixty (60) days after the scheduled closing time for the receipt of bids.

Award

Municipal

$526,700.00

Public - County

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
65
Bidding Soon
1,063
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2020

April 5, 2021

img_map_placeholder

622 Croghan St, Fremont, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.