Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Newberry, South Carolina. Completed plans call for site work for a water / sewer project.
https://www.newberryobserver.com/news/40081/celebrating-wells-japanese-garden-renovations - The City of Newberry, along with the community, and members of the Wells family, celebrated the recent upgrades to Wells Japanese Garden on Friday, December 2. "Among the things we celebrate today are the Wells family, the cultural significance of the park, the great effort that went into this renovation and the beauty of the park," Mayor Foster Senn said. Fulmer Wells designed the park, Senn said, receiving the inspiration after studying in California and creating it in honor of his grandmother, Cornelia Schumpert Wells. "It has been a great asset and a point of pride for Newberry since Mr. Fulmer Wells created this in 1930," he said. Wells Japanese Garden models appreciation for other cultures, Senn said, and is a reminder of the great friendship between Japan and the United States. Parks, Recreation and Tourism Director Collin Shealy said the ceremony was another way to celebrate the community's commitment to the Japanese garden. Since the groundbreaking for the park's renovations held in 2020, Shealy said there had been many that were instrumental in the process of what was before them today. Shealy thanked Newberry City Council for their support, the city's commitment to ensuring a sustainable garden and city departments such as public works and utilities for their efforts throughout the renovation process. Specifically, Shealy gave credit to the parks and facilities division of PRT for their tremendous amounts of time, he said, in continuing to maintain the park to what is seen today. To Scott Sawyer, former PRT director, and architect Laura Dukes for their work on the project, Shealy said he was also grateful. "We appreciate the community's patience and support as any renovation can be a little bit tough," Shealy said. In 1930, Fulmer Wells carved out a pond on the grounds and over the years various groups and individuals have assisted with the garden's maintenance. While renovations have taken place, Shealy said, those were smaller up until its most recent larger renovation. Over 50 tons of boulders, Shealy said, were imported from Northern Alabama and Tennessee to create the visual elements that are represented in many Japanese gardens. "However, some of the most important rocks are the ones that you may not see," Shealy said. The renovation process began by removing the park's ponds and rebuilding them completely, he said to incorporate many sustainable techniques. Before the renovation, there was no filtration system in the park's ponds. The park's new system was overlayed with a liner and topped with a protective shotcrete layer, keeping the water healthy and manageable. While the boulders are artfully arranged, representative of the Japanese garden designs, the vegetation in the park, Shealy said, offers seasonal interest and is adapted to the region's climate, carefully placed to imitate nature. Still to come as part of the park's renovations are an entrance gateway, leading visitors into the garden's pathways and a historical plaque, donated by members of the Wells family. "Following the completion of the renovation, we've received wonderful volunteer support," Shealy said," and we have even seen three wedding ceremonies in the short few months take place here in the garden." Mary Wells Trotter, great-granddaughter of Henry Wells Sr., said their family was thrilled with the renovations made to the park. "We're very grateful to the city and everyone who has had a hand in restoring the garden," she said. Trotter said their family had many memories in the garden, from picture-taking, picking lily pads, walking in the water and a family proposal. "We've got a lot of funny memories and a lot of happy memories, and I feel like if Uncle Fulmer and my great-grandfather were here today, they would have great big smiles on their faces," Trotter said. _____________________________________________________________________________________________ The intent of this project is to renovate the existing ponds by removal of existing sediment and organic material, re-establishment of pond edges and islands and installation of new basin, pond liner and filtration system. The Wells Japanese Garden, Newberry, S.C., was created in 1930 by Fulmer Wells, a Newberry architect and the small garden space was donated to the citizens of Newberry in 1971. In 1980 the garden was listed on the National Register of Historic Places. Over the years many volunteers have dedicated resources toward maintaining the gardens. The complexity of elements of a Japanese garden present maintenance issues and require a different maintenance skill set over other properties typically maintained by municipalities. Additionally, the natural soil waterproofing layer of the ponds has been disrupted and the ponds are not holding suitable levels of water. As plant material and the pond environment have declined, the Garden requires significant renovations.
Occupancy
Water / Sewer
$600,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 31, 2020
February 1, 2021
1608 Lindsay St, Newberry, SC
Related To This Project
Newberry, SC
--
Newberry, SC
Bid Date: Jan 25 2023
Newberry, SC
Bid Date: Feb 06 2023
Newberry, SC
Bid Date: Apr 11 2023
Newberry, SC
Bid Date: Mar 14 2023
Newberry, SC
Bid Date: Mar 24 2023
Newberry, SC
Bid Date: Apr 26 2023
Newberry, SC
Bid Date: Jun 13 2022
Newberry, SC
Bid Date: Sep 01 2022
Newberry, SC
Bid Date: Sep 26 2022
Newberry, SC
Bid Date: Sep 21 2022
Newberry, SC
Bid Date: Aug 31 2022
Newberry, SC
Bid Date: Aug 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.