BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fullerton, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Due to COVID-19 directives, City Hall is currently closed to the public. However, staff members will be present outside of City Hall starting at 1:30 p.m. and will remain onsite until after the bid opening is completed. It is highly recommended to arrive with sufficient time for bidders to be able to line up. Bidders coming to City Hall are required to wear appropriate face coverings per the Citys Municipal Code and shall keep a minimum six (6) feet of separation while waiting in line to submit and during the bid opening process per the current social distancing guidelines. Bidders wanting to utilize delivery services (USPS, UPS, FedEx, etc.) or wanting to drop off bids outside the specified time window should make arrangements with City of Fullerton staff in advance. No Bid will be accepted unless it is made on a Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. The Work shall consist of, but not limited to, removing and installing VCP sewer pipe and related appurtenances; construction of sewer manholes; abandoning sewer pipe; abandoning water main piping and appurtenances, furnishing and installing new water main piping and appurtenances; replacing concrete structures, including sidewalk, curb and gutter, cross gutter and spandrels, driveways, and access ramps; cold milling pavement and asphalt concrete overlay; construction of new asphalt concrete pavement, adjustment of sewer manholes and water valve boxes, signing and striping, traffic control, water pollution control, and all related work. The time of completion of contract shall be one hundred twenty (120) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $4,200 per calendar day. Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2018. The Contractor shall also provide Commercial General Liability Insurance, Comprehensive Automobile Liability Insurance, Workers' Compensation, and if necessary, Umbrella/Excess Liability to the minimum limits as defined in the Supplemental Information to Bidders with Certificates of Insurance for each form of coverage. No contract will be awarded to any contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division III of the State Business and Professions Code, Section 7,000,et seq. The Contractor shall possess the appropriate legal and necessary licenses required to complete the work as shown in this contract at the time the bid is submitted. In the awarding of the contract, the City shall give equal opportunity to all bidders, regardless of sex, race, creed, color, national, or ethnic origin. The City Council reserves the right to reject any and all bids, to waive any informality in the bidding, and to accept any bid or portion thereof, by order of the City Council of the City of Fullerton. Any questions regarding this bid package may be referred to David Grantham, Public Works Department Engineering Division at 714.738.6853.

Award

Water / Sewer

$2,564,295.00

Public - City

Paving, Site Work

31

10

6

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
108
Bidding Soon
2,314
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2020

February 22, 2021

img_map_placeholder

S Euclid St, Fullerton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.