BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2024 at 8:00 PM

Updated July 9, 2024

Site work, paving and outdoor lighting for a civil project in Vero Beach, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; and road / highway.

As of July 8, 2024, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Abbreviated Technical Proposal Professional Liability Insurance : $250,000.00 SR-656/17th St. East End of Bridge, Bridge Number 880077 TRC Members (Subject to Change) : Bing Wang David De Torres Kenzot Jasmi The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. SR-656/17th St. East of End of Bridge Request for As-Built Bridge Plans and Report files will be available to consultants after advertisement start. An exempt form and copy of driver license will be obtained prior to distribution. FDOT - RFP Engineering - SR-656/17th St. East End of Bridge, Bridge Number 880077 Financial Management Number(s) 446106-2-32-01 The Shortlisted firms will submit an Abbreviated Technical Proposal. The Tentative due date for the Abbreviated Technical Proposal is January 25, 2021 Tentative AFP Due Date: February 26, 2021 at 3:00 PM Longlist Date/Time 1/01/2021 07:30 pm Shortlist Selection Date/Time 1/11/2021 07:00 pm Technical Review Committee Meeting 1 Date/Time 1/28/2021 07:30 pm Final Selection Date/Time 2/15/2021 07:00 pm Negotiations Period Begin Date 3/18/2021 Negotiations Period Ending Date 4/24/2021 As of February 10, 2021, the project is currently under evaluation stage. An issuance of draft request for proposal to short-listed firms has not been disclosed. Design anticipated to begin May 2021. The bid schedule for contractors is scheduled for August 2023. Construction is slated to begin November 2023. However, a firm date has not been released.

Design

Bridges / Tunnels

$900,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
126
Bidding Soon
1,545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2025

Project location map

FL-656, Vero Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.