Published January 27, 2021 at 7:00 PM
Updated February 24, 2024
Site work and new construction of a water / sewer project in Englewood, Colorado. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
For information concerning the proposed Work contact Jacobs Engineering telephone: 623 3992078: email: jeffpittsjacobscom Booster Pump Station 1: 9674 Meridian Blvd, Englewood, CO 80112 Booster Pump Station 2: 3532 W Parker Rd, Parker, CO 80134 The completed Work will provide Owner with the facilities necessary to convert their secondary disinfectant from free chlorine to monochloramine. This will allow for direct use of WISE water and will allow for interconnections with neighboring water utilities that are using (or plan to be using) a chloramine disinfectant residual. The Work will include new sodium hypochlorite and Liquid Ammonium Sulfate (LAS) storage and feed systems, analyzers, chemical storage room additions to Booster Pump Stations 1 and 2, and pipeline contactors in the yard at Booster Pump Stations 1 and 2. The Work will include retrofitting portions of existing Booster Pump Stations 1 and 2 to provide new process piping configuration and chemical feed capabilities. The Work will include construction of two new structures with drilled concrete pier foundations. Driveway improvements and a new fire line with hydrant will be installed at Booster Pump Station 1 to address fire code requirements associated with the new Chemical Storage Building. The Work will include obtaining all necessary permits except the Grading, Erosion and Sediment Control (GESC) Permit, which has been obtained by the Owner. This may include a Federal Aviation Administration (FAA) permit if a crane or concrete pump is utilized because the Booster Pump Station 1 project site is under the flight path for Centennial Airport. The contractor will be responsible for the permit and Owner will support the coordination as required. The Contractor will be responsible for installing and removing temporary erosion control features when authorized by Douglas County.
Award
Water / Sewer
$4,098,479.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2021
February 15, 2021
9674 S Meridian Blvd, Englewood, CO
Related To This Project
Englewood, CO
Bid Date: Jul 31 2019
Englewood, CO
Bid Date: Jul 31 2019
Englewood, CO
Bid Date: Mar 12 2024
Englewood, CO
Bid Date: Apr 08 2024
Englewood, CO
Bid Date: Apr 04 2024
Englewood, CO
Bid Date: Apr 05 2024
Englewood, CO
Bid Date: Apr 11 2024
Englewood, CO
Bid Date: Mar 27 2024
Englewood, CO
Bid Date: Mar 06 2024
Englewood, CO
Bid Date: Feb 28 2024
Englewood, CO
Bid Date: Mar 01 2024
Englewood, CO
--
Englewood, CO
Bid Date: Feb 29 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.