BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in San Diego, California. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Bid Valid - 180 Days Estimated Bid Value - $127,000,000 Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% The Construction Management Professional for Alvarado 2nd Extension Pipeline (AP 2nd) will be responsible for providing Construction Management Resident Engineer (CMRE) services, Survey Services and Welding Inspection services for the construction of the 24-inch and 48-inch steel pipe in existing city streets including pavement removal and restoration as well as traffic controls. The alignment includes a railroad undercrossing through an existing sewer line to serve as a casing, steel encased crossings (Open Cut) at Caltrans I-5 and I-805 crossings, and a casing installed by trenchless methods under Highway SR-163, associated valves, valve bypasses, access manholes, cathodic protection, AV/ARs and blowoffs and connections to existing pipelines. The project includes a new below grade pressure reducing station in a vault near at the intersection of Friars Road and Napa Street as well as12" and 16" PVC waterline replacements including new hydrants and connections to existing water services. Work includes replacement of existing curb ramps with new ADA compliant curb ramps along the pipeline alignment. All water main improvements will be designed and installed in accordance with the Project Specifications, the Greenbook, the Whitebook, the approved materials list and the 2021 City of San Diego Standard Drawings for Public Works Construction. Other Details The project will require two CMREs for a duration of 1,339 construction working days plus 40 working days start up and 80 working days for close-out for the lead CMRE and 786 construction working days plus 40 days for start up for the 2nd CM RE. The project will also require a Welding Inspector for steel welded pipe installation and Survey services to include construction staking and settlement monitoring in Caltrans ROW. Working hours will be exclusively during night time, however some daytime work or weekend work will be required to ensure completion of the work and changes to the working hours could be required through the contract duration in order to meet specific project needs. The work includes associated cathodic protection, street resurfacing, curb ramps, and all other incidental work. (B-22025 Alvarado 2nd Extension Pipeline Bikeway Improvements) The project consists of Bike Lane Improvements along Sea World Drive (between Mission Bay Blvd and Pacific Highway), Friars Road (between Sea World Dr and Fresno St) and Fashion Valley Rd (between Friars Rd and Riverwalk Dr). Refer to plans 42092-D. 1.1. The Work shall be performed in accordance with 1.1.1. The Notice Inviting Bids and Plans numbered 40630-01-D through 40630-201-D, Traffic Control Plans numbered 40630-T01-D through 40630-T237-D and Alternate Items per Plans Numbered 42092-1-D through 42092-24-D, inclusive.

Post-Bid

Water / Sewer

$40,125,000.00

Public - City

Paving, Site Work

468

12

14

5

Subscribe For Documents

156 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
110
Bidding Soon
1,443
All Active Projects
703
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 26, 2024

April 24, 2024

img_map_placeholder

Multiple Locations, San Diego, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.