BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Gladstone, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Location: Hidden Hollow Park to NE 67th Terrace The Work Under This Contract Consists of the Following: the Construction of Approximately 1,900-linear Feet of Concrete Trail and Related Appurtenances in the Vicinity of Rock Creek. This project is funded by the Federal Transportation Enhancement Program. All Prime Contractors must be on MoDOTs Approved Contractor Listing 7 days prior to bid opening. DBE SubContractors must be on the MRCC DBE Directory prior to Bidding. Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify Glen Whitten, at 816-423-4131 or through Missouri Relay System, TDD, at least five (5) working days prior to the stated Bid Opening. The wage rates applicable to this project have been predetermined as required by law and are set forth in this appendices. When Federal wage rates are applicable and included, this Contract is subject to the Work Hours Act of 1962, (P. L. 87-581: 76 Stat. 357) and implementing regulations. The City of Gladstone hereby notifies all Bidders that it will affirmatively ensure that in any Contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit Bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. A Disadvantaged Business Enterprise (DBE) Goal of 10% has been established for the project. All DBEs to be used on the project must be certified and contained in the MRCC DBE Directory at the time of bidding. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to accept or reject any or all Bids. Second tier subcontracting will not be permitted on this project. MoDOT - Rock Creek Greenway Trail - Phase 2

Award

Roads / Highways

$705,626.00

Public - City

Paving, Site Work

35

1

2

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
30
Bidding Soon
725
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2021

March 22, 2021

img_map_placeholder

To Be Determined, Gladstone, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.