BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Ballston Spa, New York. Completed plans call for the renovation of a municipal facility.

The Town of Milton is an exempt organization under the Tax Law and is exempt from payment of Sales and Compensating Use Taxes on materials which are to be incorporated into the project and which are to be separately sold by the Contractor to the Owner prior to incorporation into the project, pursuant to the provisions of the Contract. These taxes are not to be included in the bid. Bid security in the amount of 5% of the Bid must accompany each Bid in accordance with the Instruction to Bidders. The successful Bidder will be required to furnish a performance bond and a payment bond, each in an amount equal to 100% of the contract price. Work shall be substantially completed on or before July 2, 2021 and ready for final payment by August 6, 2021. The Work shall consist of furnishing, installing, inspecting, maintaining, and removing soil and erosion control measures as shown on the contract documents or as ordered by the Owners Representative during the life of the contract to provide erosion and sediment control. B. Temporary structural measures provide erosion control protection to a critical area for an interim period. A critical area is any disturbed, denuded slope subject to erosion. These are used during construction to prevent offsite sedimentation. Temporary structural measures shall include check dams, stabilized construction entrance, dust control, silt fence, storm drain inlet protection, or other erosion control devices or methods as required. C. Permanent structural measures also control protection to a critical area. They are used to convey runoff to a safe outlet. They remain in place and continue to function after completion of construction. Permanent structural measures shall land grading, retaining wall, or other erosion control devices or methods as required. D. Vegetative measures shall include mulching, protecting vegetation, seeding, topsoil, and erosion control matting

Award

Municipal

$300,000.00

Public - County

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
76
Bidding Soon
1,048
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2021

April 5, 2021

img_map_placeholder

503 Geyser Rd, Ballston Spa, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.