BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in North York, Ontario. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reconstruction of Yonge Street from Florence Avenue/Avondale Avenue to Hendon Avenue/Bishop Avenue. The scope of work includes; a cross-section reduction from six to four lanes; wider sidewalks and boulevards; new and enhanced pedestrian crossing, traffic signals and turn restrictions at some intersections; a centre landscaped median; protected bicycle lanes (cycle tracks); on-street lay-bys for parking, loading and deliveries, where right-of way width permits; the removal of both northbound and southbound left-turn lanes at the intersection of Yonge Street and Sheppard Avenue; modifications in the section of Finch Avenue and Hendon Avenue/Bishop Avenue to improve TTC bus travel. A future Phase 2 Environmental Assessment will look at a redesign of Yonge Street between College/Carlton Street north to Davenport Road, focusing on an enhanced pedestrian environment, much like Yonge TOmorrow. TIMELINE: The City of Toronto Transportation Services has carried out a Municipal Class Environmental Assessment, referred to as REimagining Yonge, that could generate safer, multi-use public spaces in car-centric areas. On December 16, and for the third time, it will go to City Council for approval. The Environmental Assessment Environmental Study Report for the first stage of the REimaginging Yonge Study, from Sheppard Avenue to Finch Avenue was forwarded to City Council March 2022. The Study Focus Area consists of the Yonge Street corridor from south of Sheppard Avenue (Avondale Avenue and Florence Avenue) to north of Finch Avenue (the Finch Hydro Corridor), between Doris Avenue on the east and Beecroft Road on the west. A Request For Proposals for Consultants to complete Detailed design and operations planning is expected late 2023/early 2024 based on available funds. Subject to final completion and approval of the Environmental Assessment Study, the subsequent detailed design assignment, approvals and the allocation of funding, and the implementation of Doris Avenue connection to Tradewind Avenue and the extension of Beecroft Road. Construction for Yonge Street is anticipated to begin in 2026 or later. The contracting method is undetermined.

Design

Roads / Highways

$60,440,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
247
Bidding Soon
4,533
All Active Projects
1,769
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 5, 2026

img_map_placeholder

Yonge St, North York, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.