EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 21, 2022 at 7:00 PM

Updated January 27, 2024

Site work and paving for a road / highway in Suffolk, Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Provide all labor, materials, tools and all other items to complete the US 58 Bypass Improvement project Questions concerning this project must be in writing and addressed to the Contract Officer stated herein; and must be received no later than five (5) business days preceding the date that the bids are accepted. In compliance with this Invitation for Bid, and subject to all the conditions thereof, the bidder will, if this bid is accepted within ninety (90) calendar days from the date of the opening, agree to furnish any or all of the items and/or services upon which prices are quoted, at the price set opposite each item, to be delivered at the time and place specified herein. Bid Documents may also be obtained in electronic .pdf format, free of charge, through direct electronic transfer. Requests for bid documents in electronic format may be made by submitting an e-mail request to kodi.berger@kimley-horn.com Firms requesting electronic format bid documents must provide a contact name, name of firm they represent with mailing address, and an e-mail address for receipt of electronic files. Firms requesting electronic transfer will receive an e-mail link for direct download. Bid documents may also be obtained in CD format from the City of Suffolk Purchasing Office for a non-refundable fee of $5.00. Payment will be accepted in the form of check made payable to Treasurer, City of Suffolk only. Credit cards will not be accepted, nor will separate invoices be issued. Firms requesting direct delivery of CD of Bid Documents via US Postal Service shall also include an additional payment for a non-refundable handling fee of $5.00 per CD. The City reserves the right, at its discretion, to deduct liquidated damages from any outstanding amount due the Contractor. The DBE goal for ths project is 0%. Provide all plant, labor, superintendence, materials, tools, equipment, supplies, incidentals, and other ancillary items necessary, as identified in these Contract Documents, in order to complete the US 58 Bypass Intersection Improvements to the limits shown on the drawings and in accordance with all specification, terms, conditions, and drawings herein. This project is funded with Local, State, and Federal monies. Only VDOT prequalified contractors may bid on this project.

Award

Roads / Highways

$1,686,279.00

Public - City

Paving, Site Work

96

10

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
39
Bidding Soon
812
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2021

January 17, 2022

img_map_placeholder

US-58, Suffolk, VA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

US 58 Bypass Intersection Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.