BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2021 at 8:00 PM

Updated September 15, 2023

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Andrews Air Force Base, Maryland. Completed plans call for the construction of a 80,000-square-foot communication facility; for the demolition of a military facility; and military facility.

Award Details Contract Award Date: Aug 09, 2021 Contract Award Number: N40080-21-C-0055 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 176411069 Contractor Awarded Unique Entity ID (SAM): PLF5D1ZJDQ63 Contractor Awarded Name: BALFOUR BEATTY CONSTRUCTION, LLC Contractor Awarded Address: Falls Church, VA 22042-4516 USA Base and All Options Value (Total Contract Value): $57795000.00 https://www.theconstructionindex.co.uk/news/view/balfour-beatty-wins-us-military-contract Balfour Beatty has won a contract worth almost US$58m (GBP42m) to build a communication centre at the Joint Base Andrews military facility. The contract also contains five options, which if exercised would increase cumulative contract value to approximately US$61.7m. The work, which is expected to be completed by August 2023, provides for construction of a new consolidated communication centre for the US Air Force's 89th, 744th, and 83rd Squadrons within a single structure. Two buildings will be demolished as part of the project. The options, if exercised, provide for the audiovisual services, landscaping, water infiltration testing, air infiltration testing, and furniture, fixtures and equipment. The contract was procured competitively procured via a US government website, with six proposals received. ___________________________________________________ P3003, Consolidated Communication Center, Joint Base Andrews, constructs a 79,374 SF consolidated communication center (CCC) for the Air Force's 89th, 744th, and 83rd Squadrons within a single, two-story steel framed structure with masonry and brick veneer exterior. The facility supports critical communication functions for the Air Force, White House, and Defense Information System Agency (DISA) along with Senior Leaders Command, Control and Communications Systems (SLC3S. The communication center includes a concrete foundation, structural steel fram and standing seam roof, as well as communication support, environmental controls, pavements, parking area, exterior lighting, landscaping, and all other supports necessary to make a complete and usable facility. In addition to construction of the new facility, the project scope also includes the demolition of two (2) facilities, BLDG 1539 and 1558, totaling 105,841 SF, including removal of electrical/communications ducts, HVAC equipment, and four 25,000 gallon fuel tanks and associated piping. Addendum #1-#6 have been issued.

Award

Communication

$57,795,000.00

Public - Federal

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
185
Bidding Soon
3,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

June 24, 2021

Project location map

To Be Determined, Andrews Air Force Base, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.