Site work and renovation of a water / sewer project in Latham, New York. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of February 17, 2021, bid results are still being evaluated and project has not yet ben awarded. It is anticipated to award next month. The Work consists of constructing the following at the Mohawk View Water Pollution Control Plant, complete with all equipment and accessories, in accordance with the Bidding Documents heretofore prepared by GHD Consulting Services Inc. Base Bid clarifier equipment for two new primary clarifiers to replace existing equipment clarifier equipment for two new secondary clarifiers to replace existing equipment two new clarifier automatic brush systems four new clarifier effluent box sluice gates to replace existing equipment nine new shear gates to replace existing at the primary and secondary clarifiers new motors, bearings, and seals for two scum mixers to replace existing equipment two new secondary scum pumps to replace existing equipment two new waste activated sludge pumps to replace existing equipment modifications to the sludge transfer line in the waste process sludge building five new yard hydrants to replace existing equipment five new drain valves for the primary and secondary clarifiers concrete repair work at the primary and secondary clarifiers miscellaneous process and building improvements electrical and instrumentation improvements Add Alternate Bid Items - Contract No. 1 Install a new effluent water system from the secondary sludge pumping station No.1 to the Administration Building (Add Alternate Bid Item No. A-1) Install new effluent water piping from the junction near secondary sludge pumping station No.2 to the Screenings and Grit Building (Add Alternate Bid Item No. A-2) Rehabilitate concrete, demolish and replace the clarifier mechanisms, and complete miscellaneous rehabilitation work at secondary clarifier No. 3 (Add Alternate Bid Item No. A-3) Add Alternate Bid Items - Contract No. 2 Install electrical equipment associated with the new effluent water system (Add Alternate Bid Item No. A-4) Install electrical equipment associated with the rehabilitation of secondary clarifier No. 3 (Add Alternate Bid Item No. A-5) General Requirements - Bid Deposit Required - Insurance Required - Installation Required - Prevailing Wage Required - Certified Payroll - FOB Destination - Bid Bond 5 % - Performance Bond 100 % Question Acceptance Deadline 01/18/2021 04:00 PM EST Questions are submitted online No Bid Result : General Construction U.W. Marx $3,802,735 Electrical and Instrumentation Spring Electric $513,500

Award

Water / Sewer

$3,802,735.00

Public - City

Renovation, Site Work

62

1

13

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
178
Bidding Soon
2,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.