BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Apple Valley, Minnesota. Completed plans call for site work for a educational facility.

A. Start submittal process immediately upon contract award by the Board of Education. Actual work on site shall not commence until May 13, 2021. B. Substantial Completion 1. The work at the main stadium, including new synthetic turf by Owner, track replacement, and miscellaneous site components shall be substantially complete by August 13, 2021. 2. The work at the practice field, including new synthetic turf by Owner, fencing, scoreboard, and miscellaneous site components shall be substantially complete by October 15, 2021. This project includes the placement of free draining, select aggregate material(s), an extensive subsurface drainage system and finish grading to exacting tolerance levels. Due to the unusually strict tolerances required in grading and placement of materials, and due to the Owners need to have the facility complete as early as possible, this project will be constructed under unusually rigid guidelines and schedule. Therefore, the excavator performing work directly related to the StadiumTurf Field (within the running track) and Practice Turf Field must demonstrate specific technical expertise and ability to adhere to a tight time line. Also, the excavator must have sufficient manpower and specialized equipment to complete this project within the required time. Below, list not less than two (2) projects your organization has successfully completed within the past eight (8) years involving a High Performance sports field and high-tolerance finish grading utilizing laser guided equipment, or equivalent means. At least one (1) of the two projects must have involved a synthetic turf system (similar to that specified for this project).

Award

Educational

$4,382,600.00

Public - County

Site Work

33

18

39

9

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
68
Bidding Soon
1,671
All Active Projects
577
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 18, 2021

April 19, 2021

October 15, 2021

img_map_placeholder

14450 Hayes Rd, Apple Valley, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.