BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2021 at 8:00 PM

Updated January 26, 2024

Site work, paving and new construction of a mixed-use development in Kearney, Nebraska. Completed plans call for the construction of a 9,600-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; road / highway; for paving for a road / highway; and water / sewer project.

For furnishing all labor, tools, materials, equipment and incidentals required for construction of approximately 9600 SF metal vehicle storage building, 3540 CY of pavement, 7515 CY earthwork, site utilities, HVAC system, fencing, and work incidental thereto for VEHICLE STORAGE FACILITY. A prebid conference is not scheduled for this project.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,516,900.00

Public - City

New Construction, Paving, Site Work

46

28

4

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2021

March 22, 2021

Project location map

120 Cherry Avenue, Kearney, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.