BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Grover Beach, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

In general, the Base Bid Work shall be rehabilitating the existing lift station. The work includes, but is not limited to, replacement of everything in the wet well including the hatch, pumps, piping, fittings and all appurtenances, coating of the wet well, bypass pumping, and traffic control. The contractor shall also coordinate with the City's controls designer/contractor for controls integration work, as needed. Controls integration work shall be performed and paid under a separate contract directly between the City and the controls designer/integrator. This project was originally bid in August 2022 but withdrawn so that the City could contract controls design and integration services and provide direction to bidders to coordinate with the City's selected controls design and integration contractor during this project. Each bid shall be accompanied by cash, certified or cashier's check, or bidder's bond for not less than ten percent (10%) of the amount of the base bid, made payable to the City of Grover Beach. Bidder's inquiries shall be submitted in writing via e-mail to the City of Grover Beach, Public Works Department, at: publicworks@groverbeach.org. The cutoff time that the City will accept bidder's inquiries is 5:00 p.m. on July 13, 2023. The City will respond to bidder's inquires via bidding addenda. Any such inquiries, submitted after the cutoff time of receiving bidder's inquiries, will not be treated as a bid protest. The right is reserved by the City of Grover Beach to reject any or all bids, to evaluate the bids submitted, and award the Contract to the lowest responsible bidder. The City further reserves the right to waive any informalities or minor irregularities in the bid. The estimated opinion of probable construction cost for this Base Bid Work is approximately $165,000. This does not include controls work which is to be performed and paid under separate contract.

Post-Bid

Water / Sewer

$165,000.00

Public - City

Renovation, Site Work

45

39

8

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
40
Bidding Soon
496
All Active Projects
227
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 20, 2023

August 21, 2023

img_map_placeholder

Front St, Grover Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.