Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2021 at 8:00 PM
Updated December 13, 2024
Site work and new construction of a pre-engineered storage facility in McCook, Illinois. Completed plans call for the construction of a 22,160-square-foot pre-engineered storage facility.
Interviews for firms selected to participate in Phase II will be held on February 10, 2021 via Webex. The 8 person limit indicated in the Standard documents for Design-Build will not be enforced. All information discussed in these meetings will be considered confidential and will not be shared with any other party not participating in the meeting. Specific information regarding the time and location of the meeting(s) will be provided in the Phase II Invitation. The designers, performing licensed design services, and all major contractors/subcontractors performing any of the General, Plumbing, Heating, Ventilation, and Electrical work must be prequalified with CDB, as an A/E or contractor, before the Phase I submittal deadline. CDB does not prequalify the DB entity separately. Prequalification as a Construction Manager is not acceptable. See section 00 21 05 of the Standard Documents for Design-Build Projects 2007 (SD-DB). Any questions or requests for clarifications, and information concerning this RFP should be submitted via email and must be received by 5:00pm on October 5, 2020 (for Phase I submittals) and by 5:00pm on January 15, 2021 (for Phase II submittals) to email address below: Send inquiries to: CDB.630-128-005@Illinois.Gov All responses to inquiries, questions or requests for clarifications will be published under the Design-Build section of CDB's volume of the Illinois Procurement Bulletin located on the CDB portal. CHANGE the date for Phase II Questions or Requests for Clarifications from "by 5:00pm on January 15, 2021" as amended in the RFP to "by 5:00pm on January 30, 2021". *This project timeline has been extended due to the public health crisis.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$14,253,745.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2021
October 11, 2021
To Be Determined, McCook, IL
Related To This Project
McCook, IL
Bid Date: Dec 02 2025
McCook, IL
--
McCook, IL
Bid Date: Jul 19 2024
McCook, IL
Bid Date: Jun 14 2024
McCook, IL
Bid Date: Apr 04 2024
McCook, IL
Bid Date: Mar 21 2024
McCook, IL
--
McCook, IL
Bid Date: Apr 13 2023
McCook, IL
Bid Date: Apr 18 2023
McCook, IL
Bid Date: Jul 15 2022
McCook, IL
Bid Date: Sep 16 2020
McCook, IL
Bid Date: Mar 31 2022
McCook, IL
Bid Date: Sep 12 2023
McCook, IL
Bid Date: Dec 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
