BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Jurupa Valley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The estimated value is between $1,000,000-$1,500,000. For the work generally described as follows: The proposed work consists of removal, regrading and reconstruction of the existing pavement, adding additional paved areas for the shoulders, and grading beyond the shoulders to remedy the drainage deficiencies. All work shall be performed in accordance with the Bid Documents (including, but not limited to the Special Provisions, and Plans), the Standard Plans, the Standard Specifications, Reference Specifications, and other Contract documents on file with the City of Jurupa Valley, California. All work must be completed within Thirty (30) working days for the Base Bid and an additional Thirty (30) working days for Bid Additive A work after the date of authorization specified in the Notice to Proceed and to diligently prosecute said work, including corrective items of work, day to day thereafter, except as adjusted by subsequent Contract Change Orders. PROPOSAL, PROPOSAL GUARANTEE, and PAYMENT BOND All Proposals are to be compared on the basis of the Engineer's estimate of the quantities of work to be done. No Proposal will be accepted unless it is made on the Bidder's Proposal forms furnished by the City Each Proposal shall be accompanied by cash or a certified check or cashier's check or Bidder's Bond in the amount of ten percent (10%) of the total bid price payable to the City of Jurupa Valley as a guarantee that the Bidder, if his or her Proposal is accepted, will execute the Agreement, secure and furnish proof of Workers' Compensation Insurance, furnish any other insurance certificates as required, and furnish a Faithful Performance Bond in the amount of one hundred percent (100%) of the total bid price, Labor and Materials Bond in the amount of one hundred percent (100%) of the total bid price (See Civil Code 9550), within fourteen (14) calendar days after the date of the receipt of the Agreement. Failure to execute and furnish said documents, within said 14 days, shall be just cause for the annulment of the award and forfeiture of the Proposal guarantee pursuant to the provisions of Section 20172 of the California Public Contract Code. The City will retain the Proposal guarantee of the first, second, and third lowest responsible Bidders until such time as the Agreement is executed. The Proposal guarantees submitted by all other Bidders will be released within thirty (30) days after the date of the Award of Contract. STATE LICENSE No Bid will be accepted from a Bidder who is not fully and properly licensed as a Contractor for the work to be done under the Contract in accordance with the Provisions of Chapter 9 of Division 3, Commencing with Section 7000 of the Business and Professions Code of the State of California, at the time the Bidder submits the Bid. (B&P 7028.15) The prime Contractor shall have a Class "A" Contractor's license or a combination of Specialty Class "C" licenses sufficient to cover all of the work to be performed by the prime Contractor. All subcontractors shall be properly licensed. OWNER'S RIGHT RESERVED Within such limits as may be prescribed by law, the City Council of the City of Jurupa Valley reserves the right to reject any and all Bids, to accept, reject or waive a minor variance in a Bid, to waive any informality in a Bid or accept the Bid or Bids that best serve the interests of the City. WORK PERFORMED BY CONTRACTOR The successful Bidder shall perform, with its own organization, Contract work amounting to at least 50 percent (50%) of the Contract price, except that any designated "Specialty Items" may be performed by subcontract and the amount of any such "Specialty Items" may be deducted from the Contract price before computing the amount of work required to be performed by the Contractor. WAGE RATES This is a public works project requiring payment of prevailing wage rates. Pursuant to the Provision of Section 1773 of the Labor Code of the State of California, the City of Jurupa Valley has obtained the general prevailing rates of per diem wages and the general prevailing rate for holiday and overtime work applicable to the work to be done. Said rates are on file with the City Clerk of the City of Jurupa Valley and copies will be made available to any interested party on request. These rates shall be the minimum wage rates for this project. The Contractor shall post a copy of said rates at the job site throughout the period of work on this project. The Contractor shall see that all employees of both the prime Contractor and subcontractors are being paid rates equal to or greater than the said rates. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1 (a)). The City reminds all contractors and subcontractors of the adoption of Senate Bill 854 and encourages all contractors and subcontractors to ensure that they are familiar with and comply with the recently enacted requirements. Such requirements include, but are not limited to, the requirement that contractors and subcontractors register with the Department of Industrial Relations, State of California (DIR), pursuant to Labor Code Section 1725.5, beginning July 1, 2014. In compliance with SB 854, the City require contractors and subcontractors to be registered with the DIR prior to submitting a bid on any public works project. Bids from contractors or subcontractors that are not currently registered as required will be deemed nonresponsive, and no contractor or subcontractor will be allowed to work on a City project unless they are registered with the DIR pursuant to Labor Code Section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The contractors and subcontractors must furnish electronic certified payroll records to the Labor Commissioner. PAYMENT RETENTION OPTION Pursuant to California Public Contract Code Section 22300, the Contractor will be permitted the substitution of securities for any monies withheld by the City of Jurupa Valley to ensure performance under Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City of Jurupa Valley, or with the state or federally chartered bank as the escrow agent, who shall pay such monies to the Contractor after satisfactory completion of the Contract. Securities eligible for investment under this section shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, and standby letters of credit. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any dividends and interest thereon. TECHNICAL INFORMATION For technical information relating to the details of the proposed project and bidding requirements, please contact the Engineering Department of the City of Jurupa Valley at 8930 Limonite Avenue, Jurupa Valley, CA 92509, or by telephone 951-332-6464 x235, Chase Keys, P.E., CIP Manager.

Award

Roads / Highways

$1,148,333.00

Public - City

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
479
Active Projects
229
Bidding Soon
3,703
All Active Projects
1,661
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 27, 2021

March 26, 2021

May 7, 2021

img_map_placeholder

Bain St, Jurupa Valley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.