Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 20, 2022 at 8:00 PM
Updated October 24, 2023
Site work for a civil project in Jurupa Valley, California. Conceptual plans call for site work for a water / sewer project.
Phase 1 system consists of a regional pump station and over 56,000 feet of pipeline ranging from 8 to 24 inches. The pipelines are currently proposed to be broken into three separate construction bids. All design work on the customer side of the meter is being conducted under a separate contract with John Robinson Consulting, Inc (JRC). The Phase 1 system design and engineering construction support work will be conducted in conjunction with JRC's work and the District's Community Outreach consultant, NV5. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws, including the requirement to be registered with the Department of Industrial Relations and to file certified payroll records electronically with the Department. District shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Consultant shall make copies of the prevailing rates of per diem wages for each craft; classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the project site. Consultant shall defend, indemnify and hold the District, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Effect of Termination. If this Agreement is terminated as provided herein, District may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such document and other information within fifteen (15) days of the request.
Conceptual
Water / Sewer
$10,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2022
To Be Determined, Jurupa Valley, CA
Related To This Project
Jurupa Valley, CA
Bid Date: May 18 2022
Jurupa Valley, CA
Bid Date: Jun 11 2019
Jurupa Valley, CA
Bid Date: May 17 2022
Jurupa Valley, CA
Bid Date: May 17 2022
Jurupa Valley, CA
Bid Date: May 27 2022
Jurupa Valley, CA
Bid Date: Jul 14 2022
Jurupa Valley, CA
Bid Date: Jun 23 2022
Jurupa Valley, CA
Bid Date: Aug 01 2022
Jurupa Valley, CA
Bid Date: Apr 20 2022
Jurupa Valley, CA
Bid Date: Apr 19 2022
Jurupa Valley, CA
Bid Date: May 12 2022
Jurupa Valley, CA
--
Jurupa Valley, CA
Bid Date: Apr 21 2022
Jurupa Valley, CA
Bid Date: Sep 14 2020
Jurupa Valley, CA
Bid Date: Feb 17 2021
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed