Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Berryville, Arkansas. Completed plans call for the renovation of a water / sewer project.
For furnishing all tools, materials and labor, and performing the necessary work for construction of the Saunders Heights Tank Repainting. The work generally consists of Repainting the interior and exterior of a 1 million-gallon steel water storage tank constructed in 1983; removal and replacement of a 12-inch diameter roof vent; and all appurtenances and other items as detailed and set forth in the Contract Documents for a complete installation. All contractors intending on bidding SHALL register as a plan holder by notifying Amy Smith, Receptionist, via e-mail at asmith@olsson.com. When registering as a plan holder, contractors shall submit primary contact information including name of contractor, primary contact, phone number, fax number, and physical address. FAILURE TO REGISTER AS A PLAN HOLDER MAY RESULT IN YOUR BID BEING REJECTED. The contractors shall make such inspection and studies of the site of the work as to familiarize themselves with all conditions to be encountered. Each bid must be accompanied by an acceptable form of bid guaranty in the amount equal to at least five percent of the whole bid, and such bid bond or cashier's check shall be subject to the conditions provided in the Instructions to Bidders. At the time for opening of bids, and the name and current contractor's license number of the bidder. All bidders must be licensed under the terms of the Arkansas State Licensing Law for Contractors, A. C. A. 17-25-1-1, et seq. All bidders must also comply with The Rules and Regulations of the Contractors Licensing and Bond Law, Arkansas Administrative Rules 224-25-1, et seq. Attention is called to the fact that the minimum prevailing wage rates for each craft or type of worker and the prevailing wage rate for overtime work as determined by the Arkansas Department of Labor shall be paid. Pursuant to Arkansas Code Annotated 22-9-203, the Owner encourages all qualified small, minority, and women business enterprises to bid on and receive contracts for goods, services and construction. The Owner also encourages all general contractors to subcontract portions of their contract to qualified small, minority, and women business enterprises. The Board of Directors reserves the right to reject any and all bids and to waive any informalities in the proposal deemed to be in the best interests of the District. The District further reserves the right to withhold the awarding of the contract for a period not to exceed 60 days after the receipt of bids.
Bid Results
Water / Sewer
$269,257.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2021
February 25, 2021
Saunders Heights, Berryville, AR
Related To This Project
Berryville, AR
Bid Date: Jul 21 2022
Berryville, AR
Bid Date: Dec 04 2019
Berryville, AR
Bid Date: Aug 10 2023
Berryville, AR
Bid Date: Jun 14 2022
Berryville, AR
--
Berryville, AR
Bid Date: Nov 01 2023
Berryville, AR
Bid Date: Oct 20 2023
Berryville, AR
Bid Date: Jan 17 2024
Berryville, AR
Bid Date: Apr 29 2022
Berryville, AR
Bid Date: May 18 2022
Berryville, AR
Bid Date: May 02 2022
Berryville, AR
Bid Date: May 02 2022
Berryville, AR
Bid Date: May 02 2022
Berryville, AR
Bid Date: May 02 2022
Berryville, AR
Bid Date: Feb 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.