Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2024 at 8:00 PM
Updated May 19, 2024
Demolition and site work for a day care center in Chattanooga, Tennessee. Completed plans call for the demolition of a day care center; and for site work for a day care center.
The scope of work shall consist of but not limited to the following: The Demolition and Haul Off of the North Chattanooga Head Start Building. The Contract Documents - Prior to mailing the check you can scan and email a copy to bidinfo@chattanooga.gov. Once the email has been received with a copy of the check the requested bid documents will be emailed. Common Excavation shall consist of the removal, replacement and disposition of all materials except rock excavation to lines and grades shown on the Plans, including all construction methods and devices required to accomplish this work. The work covered under this item shall consist of removing trees, stumps, shrubs, etc., from the street right-of-way. The Contractor shall use special care to protect public and private property. The Contractor shall take special care so as not to damage any utility lines in the process of cutting and removing the trees. The Contractor shall maintain proper barricades and watchpersons to detour traffic during the cutting and removal of trees. This section shall consist of temporary control measures as shown in the plans or directed by the ENGINEER during the life of the Contract to control erosion and water pollution, through the use of berms, sediment basins, fiber mats, netting, mulches, grasses, slope drains, temporary silt fences, and other control devices. The temporary pollution control provisions contained herein shall be coordinated with the permanent erosion control features, to assure economical, effective, and continuous erosion control throughout the construction and post-construction period. The City of Chattanooga, Department of Public Works, Storm Management Division guidelines, "General Criteria for Controlling Erosion and Sediment from Land Disturbing Activities." 1988 edition shall be included in these specifications by references.
Award
Day Care Centers
$53,717.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2021
March 22, 2021
1510 Hamilton Ave, Chattanooga, TN
Related To This Project
Chattanooga, TN
Bid Date: Jun 06 2024
Chattanooga, TN
Bid Date: May 27 2024
Chattanooga, TN
Bid Date: Jun 13 2024
Chattanooga, TN
Bid Date: Jun 11 2024
Chattanooga, TN
Bid Date: Jun 06 2024
Chattanooga, TN
Bid Date: May 30 2024
Chattanooga, TN
Bid Date: Jun 27 2024
Chattanooga, TN
Bid Date: May 09 2024
Chattanooga, TN
Bid Date: May 23 2024
Chattanooga, TN
Bid Date: May 13 2024
Chattanooga, TN
Bid Date: May 15 2024
Chattanooga, TN
Bid Date: May 30 2024
Chattanooga, TN
Bid Date: Jun 21 2019
Chattanooga, TN
Bid Date: May 03 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
