BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a parking garage in Allentown, Pennsylvania. Completed plans call for the renovation of a parking garage.

Questions may be directed to Tom Smith, Director of Facilities Services, at (484) 765-4980. By Order of the Board of School Directors Allentown School District Harry Aristakesian, Business Manager The work to be performed under this contract consists of temporary shoring; concrete wall, column & pedestal spall & crack repairs; corrosion inhibitor application; concrete slab repairs; structural steel channels & wall coatings, and all associated cutting, patching and work shown or otherwise reasonably implied The Work of Project is defined by the Contract Documents and consists of the following: 1. Temporary shoring. 2. Concrete wall, column & pedestal spall & crack repairs. 3. Corrosion inhibitor application. 4. Concrete slab repairs. 5. Structural steel channels & wall coatings 6. All other Work indicated in the Contract Documents. B. Removal and replacement requirements 1. General a. Photograph existing conditions at each repair location to document the location and visually observed condition of existing finishes and equipment and submit indexed or keynoted photographs in electronic form to Owner. b. Remove and reinstall systems, materials, devices, and supporting accessories as required to install indicated repairs. 1) Carefully remove components. 2) Secure removed components during repair installation. c. Reinstall removed components to match preconstruction function, performance, and appearance. d. Replace in kind any components damaged during removal, storage, or reinstallation. a) Match the type, size, quantity, quality, durability, and aesthetic appearance of original components to the satisfaction of Owner and Engineer. b) Provide submittals for replacement components for Engineer approval in advance of ordering, delivery, and installation. c) Where reviewed replacement components are not available for Substantial Completion, furnish and install temporary components meeting the function and performance of the original components. Remove temporary components and install permanent replacement components when available in coordination with Owner.

Award

Parking Garage

$345,975.00

Public - City

Renovation

10

15

8

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
120
Bidding Soon
2,589
All Active Projects
1,269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2021

June 21, 2021

img_map_placeholder

106 N 17th St, Allentown, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.