Site work and new construction of a mixed-use development in Kerrville, Texas. Completed plans call for the construction of a 11,000-square-foot medical facility; for site work for a medical facility; and water / sewer project.
The Health and Human Services Commission is soliciting proposals for the selection of a Construction Manager-at-Risk to provide the following services: (i) pre-construction services, such as constructability guidance, cost estimates, site evaluations, and construction schedules; (ii) upon completion of the design development phase, provide a Guaranteed Maximum Price at the election of HHSC; and (iii) perform complete construction services consistent with the construction manager-at-risk delivery process described in the attached draft contract between Owner and Construction Manager-at-Risk for Project No. 20-013-KSH, New Laundry Building and Site Water Upgrades at Kerrville State Hospital. Construction-Manager-at Risk (CMR) shall perform and coordinate all pre-construction and construction services for the following project as a single package or in multiple combination packages: Provide a new metal building and site development for laundry operations comprised of approximately 11,000 square feet. The building includes but is not limited to all building structure, interiors finish out, mechanical, electrical and security systems. The site development includes but is not limited to site preparation, underground utilities, hardscape, vehicular drives, surface parking. Laundry Equipment will be provided by Owner. A campus wide analysis will be performed by engineer to evaluate campus water pressure concerns. The final report will provide proposed solutions and cost estimates. PHASE I: Collaborate with HHSC and its architects and engineers (A/E), Chesney Morales Partners, during the drafting and completion of the Construction Documents. The Respondent's expertise will be used to affect value engineering, establish a project schedule, and ultimately determine the Guaranteed Maximum Price. The services include, but are not limited to, attendance at meetings, and consultation regarding plan reviews, constructability reviews, and cost estimating. PHASE II: In accordance with the approved schedule and GMP, Contractor shall facilitate bidding and selection of subcontractors in compliance with HUB requirements and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E and HHSC. Deadline for Submitting Questions Friday, 1/15/20201 by 5:00 P.M. CENTRAL TIME Respondents should consider the Cost of Work to be $2,104,811.00. Submit a security bond in the form of a cashier's check, certified check, or original bid bond payable to the Health and Human Services Commission, in an amount of $25,000.00, to be held by the Owner's representative in accordance with Exhibit H. No other form of security will be accepted. HHSC reserves the right to accept or reject any assumptions. All assumptions not expressly identified and incorporated into any Contract resulting from this RFP are deemed rejected by HHSC.
Post-Bid
Medical
$2,104,811.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2021
April 12, 2021
721 Thompson Dr, Kerrville, TX
Related To This Project
Kerrville, TX
Bid Date: Mar 05 2020
Kerrville, TX
Bid Date: Jul 02 2019
Kerrville, TX
Bid Date: Sep 26 2018
Kerrville, TX
--
Kerrville, TX
Bid Date: Dec 05 2023
Kerrville, TX
--
Kerrville, TX
Bid Date: Nov 14 2024
Kerrville, TX
--
Kerrville, TX
Bid Date: Sep 14 2021
Kerrville, TX
Bid Date: Nov 14 2023
Kerrville, TX
Bid Date: Nov 21 2023
Kerrville, TX
--
Kerrville, TX
--
Kerrville, TX
--
Kerrville, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.