Published June 21, 2022 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Ellsworth AFB, South Dakota. Completed plans call for the construction of a 44,487-square-foot military facility; 43,776-square-foot military facility; 5,000-square-foot military facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Contract Award Date: Jun 01, 2022 Contract Award Number: W9128F22C0024 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Bryan Construction Inc. Contractor Awarded Address: Colorado Springs, CO 80920 USA Base and All Options Value (Total Contract Value): $72606305.00 SOLICITATION NO. W9128F-21-R-0079 PROCUREMENT TYPE: Pre-solicitation TITLE: B-21: Formal Training Unit/Aircraft Maintenance Unit (FTU/AMU) CLASSIFICATION CODE: Y -- Construction of structures and facilities NAICS CODE: 236220 -- Commercial and Institutional Building Construction PSC CODE: Y1JZ - CONSTRUCTION OF MISCELLANEOUS BUILDINGS DESCRIPTION: On or about 5 August 2021, this office will issue Request for Proposal (RFP) for CONSTRUCTION OF A B-21 Formal Training Unit/Aircraft Maintenance Unit (FTU/AMU), at Ellsworth AFB, South Dakota. The solicitation will close on or about 6 September 2021. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 236220 is included in their profile prior to submission of offer. SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: Please be advised of on-line registration requirements for Contractor Registration and for Representations and Certifications Application which are now located in System for Award Management 'SAM' database at https://sam.gov/. The representations and certifications section in SAM are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from the date of initial submission and expire on an annual basis from the update to SAM. PROJECT DESCRIPTION (approx. quantities) This will be a bifurcated solicitation with Volume I Technical proposals due approximately 30 days after solicitation. Volume II Pricing and Pro Forma proposals will not be requested until after receipt of Volume I proposals. Volume II proposals will be due approximately 30 days after issuance of the Volume II amendment, which will require the contractor to provide the government with a complete facility and warranty based on the Request for Proposal (RFP). Construct a B-21: Formal Training Unit/Aircraft Maintenance Unit (FTU/AMU) at Ellsworth Air Force Base (EAFB), South Dakota (SD). This is one of the first major construction projects that serves as part of a multi-year facilities beddown in support of the B-21 program at EAFB, SD. This project will include a new +/- 44,487 SF of secure aircraft maintenance space, +/- 43,776 SF of secure squadron operations space, and a +/- 5,000 SF non-secure flight kitchen in support of B-21 operations at EAFB with all associated site work, demolition, utilities, and infrastructure. The project may also include bid options for furniture, furnishing and equipment (FF&E), intrusion detection systems (IDS), access control systems (ACS), and closed-circuit television (CCTV) systems. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special construction and functional requirements: This project will be constructed near flightline facilities at EAFB. As such, the project may be constructed adjacent to - and may be required to integrate with - active airfield operations. Demolition of existing facilities, utilities, and infrastructure - to include hazardous materials soils may be required. Large portions of the facilities to be constructed and accredited to ICD/ICS 705 criteria. Special oversight of these spaces may be required during construction. The Contractor will be required to commence work within 90 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 800 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The above project description is for information only. Project scope of work is subject to change. The estimated construction cost of this project is between $25,000,000 and $100,000,000. SOLICITAITON EVALUATION CRITERIA Firms participating in the solicitation will submit technical requirements in accordance with Section 00 22 00 EVALUATION CRITERIA. Submissions will be evaluated based on a best value approach considering technical elements for evaluation (i.e., Specialized Experience, Key Personnel, Past Performance, Project Management Plan, and Small Business Participation). An adjectival method of evaluation will be used to evaluate all technical factors. Price will be evaluated separately for reasonableness and realism. A Best Value selection will be considered after reviewing price and technical factors. DO NOT submit requests for plans and specifications to the site visit personnel. See 'Obtaining Solicitation Documents' below. This will be a Bifurcated solicitation process following FAR Part 15, Contracting by Negotiation. The Bifurcated, Request for Proposal (RFP) Best Value Trade-off, procurement process includes utilizing a Tradeoff Source Selection Process (see FAR 15.101-1). This process allows for a tradeoff between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best-value contract award. The solicitation will be issued with 100% backcheck set specifications at which time only Volume I Technical proposals will be requested. The 100% design specifications will be issued approximately 30 days following the Volume I solicitation at which time Volume II remaining Technical Proposal and Price Proposal will be requested. Any offeror who does not submit Volume I by the due date and time indicated on the SF 1442 will be ineligible to submit Volume II. Submission of Volume I proposals will include the following technical evaluation factors: Factor 1 (Specialized Experience); Factor 2 (Project Management Plan); Factor 3 (Past Performance); and Factor 4 (Key Personnel). Submission of Volume II proposals will only include Factor 5 (Small Business Participation) and Factor 6 (Pricing Schedule). Due to current limitations of access to the proposed project site, USACE is unable to offer an in-person site visit nor physical access to the project site. To remedy, USACE plans to provide all interested parties "Virtual Site Access", through photos, files, and drawings as follows: Site Photo Survey, Design Drawings (all volumes) - to include site survey drawings. Additionally, a virtual site visit teleconference and webinar will be scheduled for 1-2 weeks after issuance of the RFP for Volume I proposals. Instructions for obtaining access to the virtual site visit will be included in RFP section 00 21 00. If conditions allow, the Government may make access to the proposed project site available to those that submit Volume I proposals as defined by Section 00 22 00. If the Government determines a physical site visit is possible, instructions will be provided via amendment after receipt of Volume I proposals. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Contract Opportunities (SAM.gov > Contract Opportunities) at https://sam.gov/. Find solicitation announcement in Contract Opportunities (https://sam.gov/content/opportunities): 1. Use the "Search Contract Opportunities" search function to locate the project (by entering the solicitation number) or use the advanced search features offered or use the "Federal Organizations" search feature followed by the "Advanced Search" feature. 2. By using the "Sign In" feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the "Attachments/Links" section of the solicitation. Questions should be sent to the Contracting Specialist, Ms. Katherine Fisher, at Katherine.K.Fisher@usace.army.mil, and the Contracting Officer, Mr. William Rawe, at William.T.Rawe@usace.army.mil. INQUIRIES: A bidder inquiry key will be included in the solicitation. Questions regarding the solicitation will be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/. Telephone calls will not be accepted. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$72,606,305.00

Public - Federal

New Construction, Paving, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Steel Roof Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Formed Metal Fabrications, Column Covers
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Vapor Retarders, Air Barriers, Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels, Siding, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Plastering, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Sheet Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Carpeting, Access Flooring, Painting and Coating, Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Plaques, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Storage Assemblies, Exterior Specialties, Exterior Protection, Protective Covers, Other Specialties, Pest Control Devices, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Window Treatments, Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Bowls, Rugs and Mats, Entrance Floor Mats and Frames, Floor Mats, Runners, Furniture, Seating, Chairs, Systems Furniture, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Special Activity Rooms, Saunas, Integrated Construction, Radiation Protection, Lead Sheet
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Cooling Equipment, Packaged Water Chillers, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment, Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts, Electrical Utilities, Electrical Utility Transmission and Distribution, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
64
All Active Projects
29
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 28, 2022

img_map_placeholder

To Be Determined, Ellsworth AFB, SD

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

B-21: Formal Training Unit/AMU (FTU)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.