BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Tallahassee, Florida. Working plans call for the construction of a clubhouse / community center; for site work for a clubhouse / community center; fire / police facility; and fire / police facility.

The City of Tallahassee (Owner) will construct a new fire station and community resilience center on the former Lake Bradford Road Wastewater Treatment Facility located at 1815 Lake Bradford Road in Tallahassee, Florida. The estimated occupancy date is 2024. The City is considering the services of a Construction Management Firm At Risk (CM/GC) for the Project. In addition to managing the construction, the CM/GC will provide technical review, cost evaluation and schedule evaluation assistance to the architectural/engineering team during the design phase. Bid #RFQUAL-026-22-CC - Construction Management at Risk for Fire Station 17 and Resilience Center The City of Tallahassee (Owner) will construct a new fire station and community resilience center on the former Lake Bradford Road Wastewater Treatment Facility located at 1815 Lake Bradford Road in Tallahassee, Florida. The estimated occupancy date is 2024. The City is considering the services of a Construction Management Firm At Risk (CM/GC) for the Project. In addition to managing the construction, the CM/GC will provide technical review, cost evaluation and schedule evaluation assistance to the architectural/engineering team during the design phase. CM/GC will assume responsibility for project construction cost by issuing a Guaranteed Maximum Price (GMP) not later than 80% through the design phase. The GMP will be a contractual obligation. CM/GC will also develop an overall project schedule, which will be a contractual obligation. In addition, CM/GC will be responsible for methods of construction, safety, and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its predetermined budget and schedule. The CM/GC will be expected to work closely during the design, pricing, permitting and construction phases with the contracted architectural design firm chosen by the City. MBE: 14% WBE: 9% Confirmed shortlist.

Final Planning

Fire / Police

$1,915,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
20
Bidding Soon
334
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.