Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a fire / police facility in Flandreau, South Dakota. Working plans call for the construction of a fire / police facility.
https://www.keloland.com/news/local-news/old-grain-elevator-demolished-in-flandreau-to-prepare-for-whats-next/ FLANDREAU, S.D. (KELO) — A landmark of many small rural towns across KELOLAND is often the local grain elevator. An old one in Flandreau was demolished Monday to pave the way for future projects. It’s not quite the size of the notorious Zip Field Mill, but at least this structure came crashing down during demolition. Crews took heavy machinery to the old grain structure near the courthouse in Flandreau and it came down Monday afternoon. “It was it was just a historic moment. Whenever you see something or something like this that’s kind of the skyline of Flandreau all of a sudden come down, and all the people, and we should have probably sold admission and we probably could have paid for the cost of tearing the structure down,” Flandreau mayor Dan Sutton said. Sutton and fire chief Don Peters both grew up in Flandreau. Extra signage put up at Falls Park “I come around the corner and it wasn’t sticking up in the air anymore. So yeah, it definitely changes the view,” Peters said. The main reason for getting the demolition done is so they can break ground on a $3.9 million fire station that will be built on the same city block. “We want it centrally located, and this was the one spot that was the best location to redevelop, and what we hope, not only the fire station, we hope it leads to other things. Whether it be residential or commercial opportunities or both for the remainder of the area,” Sutton said. Peters says the new fire station is more than double the space they currently have. “We’re excited to have a home where we can put everything all under one roof, and be a little more efficient, and be a little better at maintaining everything and training will go better,” Peters said. It’s an exciting time as the town looks back on the past and forward to the future. “You always hate losing those landmarks, but losing those landmarks means that sometimes there’s progress, and we look forward to redeveloping this whole area over here,” Sutton said. They plan to break ground for the new fire station later this spring with hopes of completion at the beginning of 2024. --------------------------------------------------------------- Project to include new fire station. As of July 29, 2022, the project is in the late planning phase. should bid in fall 2022 and start in spring of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Final Planning
Fire / Police
$2,700,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2023
To Be Determined, Flandreau, SD
Related To This Project
Flandreau, SD
--
Flandreau, SD
Bid Date: Sep 09 2022
Flandreau, SD
Bid Date: Apr 09 2024
Flandreau, SD
Bid Date: Apr 26 2023
RFQ Construction Manager - Construction Management services for Restorative Justice Center - 5135560
Flandreau, SD
Bid Date: Aug 11 2023
Flandreau, SD
Bid Date: Aug 04 2023
Flandreau, SD
Bid Date: Jan 19 2022
Flandreau, SD
Bid Date: Dec 13 2023
Flandreau, SD
Bid Date: Dec 29 2022
Flandreau, SD
--
Flandreau, SD
Bid Date: Dec 06 2022
Flandreau, SD
Bid Date: Oct 17 2022
North Sioux City, SD
Bid Date: Jun 13 2022
North Sioux City, SD
Bid Date: Jun 13 2022
Pierre, SD
Bid Date: Jul 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.