Site work and new construction of a civil project in Miami, Florida. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and bridge / tunnel.
Contract Award Date: Aug 20, 2021 Contract Award Number: W912EP21C0017 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 055076616 Contractor Awarded Unique Entity ID (SAM): RK7NKN684PC3 Contractor Awarded Name: Kiewit Infrastructure South Co. Contractor Awarded Address: Fort Worth, TX 76177-2403 USA Base and All Options Value (Total Contract Value): $10217000.00 The Biscayne Bay Coastal Wetlands (BBCW), Contract 5B covers the construction of Pump Station S-703, a spreader system, and two recreational sites. The S-703 pump station has a capacity of 50 cfs and is located at the intersection of the C-102 and L-31E Canal. S-703 will pump water from the L-31E Canal/C-102 into wetlands, east of the L-31E Levee and north of the C-102, via a dissipation/spreader basin and an earthen spreader canal. The two recreational sites will be located east of the L-31E Levee and north of the C-102, near Biscayne Bay. Work will include construction of a shelter with information kiosk, and two tent sites/pads. The pump station will have manatee protective barriers, trash racks, and de watering features, complete with stop logs. Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure. The pumps will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, cast-in-place concrete, remit concrete, flow able fill, control building, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, back filling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerick road topping, rip rap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include deteriorating, and installation of cofferdams. FP&L will provide 3-Phase, 277/480V service for S-703 by way of a new 3-Phase, OHE power line to S-703, coming from pump station S-705 to the south, and from the west side of L-31E Canal. Also, in coordination with the South Florida Water Management District (SFWMD), FP&L will relocate the 1-Phase, OHE powerline, serving spillway S-21A, as it is currently in interference with project features. The relocated 1-Phase, OHE power line will be installed in locations where it will not interfere with construction features/activities. This work will be complete before this contract is awarded. In-water construction utilising divers will be necessary, because of deteriorating difficulty due to the local geology and high conductivity of the underlying limestone. Soil borings indicate the presence of hard limestone within the project area. Excavation of limestone may require large excavator with rock bucket. Materials for embankment and backfill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government. Contract does not allow blasting within the construction limits. PROPOSAL REQUIREMENTS: AWARD WILL BE MADE TO THE OFFEROR WHO SUBMITS THE LOWEST PRICED, TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL. PROPOSALS WILL BE EVAULATED BASED ON TECHNICAL ACCEPTABILITY (DEMONSTRATED EXPERIENCE AND PAST PERFORMANCE) AND PRICE. A Pre-Proposal Conference will be held on Wednesday, 09 June 2021 from 10:00am - 11:00am, Local Time via teleconference. The call-in number is: 1-844-800-2712 Access code: 199 392 9265. It is requested that an email be sent to Timothy.G.Humphrey@usace.army.mil to confirm attendance by your organisation. DESCRIPTION OF WORK: The Biscayne Bay Coastal Wetlands (BBCW), Contract 5B covers the construction of Pump Station S-703, a spreader system, and two recreational sites. The S-703 pump station has a capacity of 50 cfs and is located at the intersection of the C-102 and L-31E Canal. S-703 will pump water from the L-31E Canal/C-102 into wetlands, east of the L-31E Levee and north of the C-102, via a dissipation/spreader basin and an earthen spreader canal. The two recreational sites will be located east of the L-31E Levee and north of the C-102, near Biscayne Bay. Work will include construction of a shelter with information kiosk, and two tent sites/pads. The pump station will have manatee protective barriers, trash racks, and deteriorating features, complete with stop logs. Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure. The pumps will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, cast-in-place concrete, tremie concrete, flow able fill, control building, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerick road topping, riprap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams. FP&L will provide 3-Phase, 277/480V service for S-703 by way of a new 3-Phase, OHE power line to S-703, coming from pump station S-705 to the south, and from the west side of L-31E Canal. Also, in coordination with the South Florida Water Management District (SFWMD), FP&L will relocate the 1-Phase, OHE power line, serving spillway S-21A, as it is currently in interference with project features. The relocated 1-Phase, OHE power line will be installed in locations where it will not interfere with construction features/activities. This work will be complete before this contract is awarded. In-water construction utilising divers will be necessary, because of deteriorating difficulty due to the local geology and high conductivity of the underlying limestone. Soil boring indicate the presence of hard limestone within the project area. Excavation of limestone may require large excavator with rock bucket. Materials for embankment and back fill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government. Contract does not allow blasting within the construction limits. Magnitude of construction is between $5,000,000.00 and $10,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$10,217,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2021
September 7, 2021
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Sep 14 2022
Miami, FL
Bid Date: Sep 23 2022
Miami, FL
Bid Date: Sep 05 2022
Miami, FL
--
Miami, FL
Bid Date: Sep 14 2022
Miami, FL
Bid Date: Sep 22 2020
Miami, FL
Bid Date: Jun 22 2021
Miami, FL
Bid Date: Apr 14 2021
Miami, FL
Bid Date: Apr 30 2019
Miami, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.