BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2021 at 8:00 PM

Updated January 26, 2024

Renovation of a transportation facility in Grapevine, Texas. Completed plans call for the renovation of a transportation facility.

Energy Plaza Condenser Water System rehabilitation M/WBE) GOAL: 20% The independent estimate of this work is $10,154,128.00. 1. Remove concrete cooling tower discharge shroud and replace with new fiberglass shroud. 2. Remove and replace the cooling tower fans and motors with new variable speed fans; provide new motors, fans and variable speed drives: a. Base Bid is new gear driven fans. Fan gear boxes shall have integrated heaters and oil filtration system. b. Alternate 1 is new direct drive fans. c. Provide new vibration monitoring system for Base Bid and Alternate 1. 3. Remove and replace the cooling tower fill. Remove and replace the cooling tower nozzles and distribution header piping. 4. Remove and replace the drift eliminators. 5. Clean internal surfaces of cooling tower to remove algae. 6. Repair and patch concrete spalling and cracks. 7. Remove and replace access panels, ladders, and catwalks for improved access into the Cooling Tower and its lower plenum. 8. Replace all condenser water pump check valves with non-slamming valves. 9. Provide new modulating actuators on cooling tower cell bypass valves. 10. Provide new condenser water pump coupling guard mesh screens, new pump ID nameplates, clean pump hub and retaining rings, remove/replace pump packings, 11. Remove metal mesh screens in the pump basins and discard. 12. Provide integration of new control components with the existing Delta V control system. Update the Delta V graphic user interface and sequence of operations per the design documents 13. Remove and replace metal or FRP access components (stairs and catwalks) with new components as indicated per the design documents. 14. Remove and replace basin sweeper system. Remove sediment from the cooling tower basins and coat basins during this work 15. Remove existing chlorine gas injection room on the west fan deck. 16. Design all required automatic temperature controls for the works included in the contract. 17. Design additional drain holes in roof slab. 18. Provide equipment Start-Up test reports for all new mechanical and HVAC equipment.

Bid Results

Transportation Terminals

$11,483,637.00

Public - City

Renovation

64

24

17

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
7
Bidding Soon
2,675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2021

May 13, 2021

Project location map

2375 N International Pkwy, Grapevine, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.